USS Coronado Completes Final Contract Trials

By Eric Haun
Monday, June 09, 2014
USS Coronado (LCS 4). U.S. Navy photo by Keith DeVinney

USS Coronado (LCS 4) successfully completed final contract trials (FCT) June 6.

The trial, administered by the U.S. Navy's Board of Inspection and Survey, is part of a series of post-delivery test and trial events through which the ship and its major systems are exercised.

The four-day FCT began with pre-underway and material condition checks, followed by at-sea demonstrations. Trial highlights included combat systems air and surface detect-to-engage scenarios, 57mm gun firing exercises, main propulsion full power and maneuvering testing and launch and recovery of the 11-meter rigid hull inflatable boat.

"It was a pleasure to witness Cmdr. Johnston and his crew put Coronado through her paces. I was equally pleased with the performance of the ship systems during this, the first final contract trial of the LCS Independence variant," said Capt. Tom Anderson, LCS program manager for the Navy's Program Executive Office Littoral Combat Ships (PEO LCS). "It is clear that the changes incorporated into Coronado, based on lessons learned from the construction and operation of USS Independence, have contributed not only to her affordability, but to her operational capability."

LCS 4 will undergo a Post Shakedown Availability this fall. In 2015, the ship will execute an Initial Operation Test and Evaluation with a surface warfare mission package embarked and then forward deploy.

LCS is a high-speed, agile, shallow draft, mission-focused surface combatant designed for operations in the littoral environment, yet fully capable of open ocean operations. LCS is complementary to the surface fleet, with the ability to counter and outpace evolving threats independently or within a network of surface combatants.

PEO LCS provides a single program executive responsible for acquiring and maintaining the littoral mission capabilities of the class from end to end, beginning with procurement and ending with fleet employment and sustainment.

navy.mil
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Denmark Adopts Digital Ship Certification

As of June 24, 2016, ships flying the Danish flag are being digitally certified, making Denmark one of the first countries to put an end to the 100-year-old tradition

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

Navy

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

News

HCI Capital Renamed Ernst Russ AG

A vote was passed at the ordinary shareholders’ meeting of HCI Capital AG yesterday to change the company’s name to Ernst Russ AG. The Executive Board and Supervisory

ABP orders Two Gottwald cranes

Terex Port Solutions (TPS) has received an order from Associated British Ports (ABP) for two electric Terex Gottwald Model 8 portal harbour cranes in the G HSK 8424 B four-rope grab variant.

Traffic Separation Schemes off Western Australia

On 1 December 2016 two new Traffic Separation Schemes (TSS) will come into effect off the south-west coast of Western Australia. Australia’s proposal to establish

Eye on the Navy

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

Vessels

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

Kiel is First German Port of Call for Mein Schiff 5

The brand-new TUI Cruises newbuilding Mein Schiff 5 has arrived in Kiel – her first German port of call since being handed over in Turku, Finland, a few days ago.

ST Marine Delivers 4th Patrol Vessel to Oman

Singapore Technologies Marine Ltd (ST Marine), the marine arm of Singapore Technologies Engineering Ltd (ST Engineering), has held the Interim Acceptance ceremony

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1180 sec (8 req/sec)