US Navy Completes Testing Cobra Bow Bulb

Press Release
Wednesday, August 08, 2012

Naval Surface Warfare Center (NSWC) Carderock Division researchers complete testing of bulb bows for DDG 51-class.

Partnering with Program Executive Office (PEO) Ships and the Naval Sea Systems Command (NAVSEA) Fleet Readiness Research and Development Program, NSWCCD conducted testing as part of the Navy's overall initiatives to reduce fuel consumption.

Located near the waterline, the bow bulb is an inverted tear drop shape that protrudes from the hull and is designed to reduce the ship's wave resistance. Specifically, the bow bulb creates a wave designed to interfere with the existing bow wave which reduces the amount of drag on the ship as well as fuel consumption and engine exhaust emissions.


"It is my hope that the DDG 51 class bow bulb will parallel the success of previous [NAVSEA] sponsored designs such as the stern flap, and not just improve the capabilities of the Navy's combatants, but provide for a reduction in fuel consumption and for millions of dollars in cost savings as well," said Dominic Cusanelli, NSWC Carderock Bow Bulb testing project lead, who developed the current bow bulb design for use on a naval combatant in the early 1990s. 


Through computational fluid dynamics, NSWC Carderock designed and evaluated more than 20 bow bulb prototypes for DDG 51-class ships. Following the evaluation, NAVSEA selected the four most promising bow bulb prototypes for fabrication and model testing. The model tests will identify the bulb design with the best potential for powering and fuel reduction. 


Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Conrad Shipyard Forms LNG Business Unit

Conrad Shipyard has formed a new business unit focused on LNG projects.   Conrad, builder of North America’s first LNG bunker barge scheduled for 2017 delivery,

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

Navy

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0676 sec (15 req/sec)