"A Whale" Tests Not Conclusive

Tuesday, July 06, 2010

Tests on “A Whale”, a supertanker adapted to skim oily water from the surface of the , are inconclusive because of high seas, ship owner TMT Shipping Offshore reported in a Reuters report. The 1,100-ft. (335 m)-long ore and oil carrier named "A Whale" is being positioned as a potential savior of efforts to clean the oil pollution because it is designed to collect 500,000 barrels (21 million gallons) per day of contaminated water.

It operates by allowing oily surface water into the ship through a series of a dozen slits on the port and starboard sides of the ship near the bow. The liquid is then decanted through a series of tanks to separate oil and water.

(Source: Reuters)

 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

India May Add Japanese Soryu-Class Submarines to its Fleet

India is reportedly considering a project to incorporate six Japanese Soryu-class diesel-electric submarines into its fleet, says The Japan Times.   The Defense

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1217 sec (8 req/sec)