Novacavi Cables Used for Concordia Wreck Removal

Posted by Eric Haun
Tuesday, November 26, 2013

Novacavi reported a second supply of marine cables used in the Costa Concordia shipwrecking salvage operation off the shore of the island of Giglio, Italy.

As the first delivery successfully performed during the parbuckling phase, Novacavi was called in again to provide high tech custom tailored cables for the positioning and survey systems in use in the progressing operation of Concordia wreck removal.

Individually designed, tested and manufactured to be suitable for their specific application, these customized marine cables further broadened Aquancable, the wide range of specialist bespoke cables for maritime and underwater technologies made by Novacavi.

novacavi.it
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Smoke: Cruise Ship Evacuates Passengers

A number of passengers and crew members were evacuated after smoke was spotted billowing from the front section of Carnival Liberty cruise ship docked in the Dutch Caribbean nation of St Maarten.

Salvage, Wreck Removal Beset with Chronic Problems

The basic nature of maritime casualties, salvage and wreck removal has evolved rapidly over the last few years. Ships and offshore constructions have become more technologically elaborate,

EALs & Oil Spill Remediation

EALs & Oil Spill Remediation: The Effects of EALs on Oil Spill and Discharge Reporting and Remediation In the wake of increased environmental scrutiny and potentially expanding liability issues,

News

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Marine Equipment

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

Viking Bags Charter Deal for AHTS Brage Viking

Viking Supply Ships has entered into a contract with an Oil major for the charter of “Brage Viking” commencing 1stof April 2015. The duration is for 2 years and 8 months firm,

Subsea Salvage

Salvage, Wreck Removal Beset with Chronic Problems

The basic nature of maritime casualties, salvage and wreck removal has evolved rapidly over the last few years. Ships and offshore constructions have become more technologically elaborate,

Moskito to Recover Oil from Sunken Wrecks

A tool for removing oil in submerged vessels was developed in Norway by Miko Marine. Moskito is designed to address the pollution threat that exists with the

Rolls-Royce to Supply Engines for First Seabed Mining Vessel

Rolls-Royce has secured a landmark agreement to supply six of its new B33:45 medium-speed diesel generator sets to China’s Fuijan Mawei shipyard for configuration

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1713 sec (6 req/sec)