Bolidt Underlay Worth Weight for ConocoPhillips

Press Release
Wednesday, April 04, 2012
A ConocoPhillips superstructure in the Ekofisk field (Photo: Bolidt).

Efforts by ConocoPhillips to achieve the lightest weight possible for the superstructure of its Ekofisk L accommodation facility have been demonstrated by its selection of an underlay construction material.

The oil major has selected Boliscreed 400 for the high-profile North Sea unit, which will replace the longstanding Ekofisk H and Ekofisk Q as part of ConocoPhillips plans to prolong activities in the Ekofisk field by up to 40 years.

Ekofisk L’s top side is currently under construction at Singapore’s Sembawang (SMOE) shipyard, while the unit’s support struts and structures are under completion at the Aker Verdal facility, Norway. The completed unit is due to enter service before the end of 2013. As well as acting as an accommodation unit, Ekofisk L will also be a new field centre for the Greater Ekofisk Area and the platform will be connected to the existing Ekofisk Complex via a bridge.

“Boliscreed 400 will cover an area of around 14,000m2 onboard Ekofisk L and will play a critical role in ensuring that the unit’s steel surfaces are levelled to accept the installation of cabins and public spaces,” said Jacco van Overbeek, Bolidt Director Global Shipbuilding Division. “The material is 20 percent lighter than conventional epoxy-based products.” 

In addition to its 552 cabins, the DNV-classed accommodation unit will also have space for a number of field centre functions, such as a heli-deck and hangars, 75 office workspaces and a number of auxiliary systems such as fire water and freshwater supply.
An experienced, multi-discipline team from ConocoPhillips is on-site at SMOE to monitor the construction of the topside itself, two bridges and one bridge support.
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Ultra-deepwater Drillship 'Maersk Valiant' Delivered

Maersk Drilling advises that its second new drillship, 'Maersk Valiant', has been delivered from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea.

Miami Tugboat Oil Spill: Coast Guard Respond

The US Coast Guard says that its crewmembers are responding to a fuel spill in the vicinity of Government Cut in Miami, following a leak discovered aboard the 95-foot tugboat 'Neptune'.

Latest Shipbuilding Contracts Include VLCC Order for Philippine Yard

In the latest Clarkson Hellas S&P Weekly Bulletin newbuilding orders are reported in Far East shipyards for a range of vessels as follows: Bulk carriers Clarkson

Offshore

POSH may raise $311 Mln in Singapore IPO

PACC Offshore Services Holdings (POSH) could raise at least S$388.27 million ($311 million) after pricing its initial public offering near the bottom of the pricing range indicated earlier,

BOEM gives more time to submit plans OCS

The Bureau of Ocean Energy Management (BOEM) announced today the publication of its Final Rule to extend time requirements for submitting a Site Assessment Plan

Offshore Driller Noble Corp Q1 Earnings Beat Forecasts

Noble Corp., a leading offshore driller, reported first-quarter net income on Wednesday of $0.99 a share, higher than consensus forecasts, as new rigs helped lift revenues.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2060 sec (5 req/sec)