Navy Energy Conservation Open BAA Released

Tuesday, February 08, 2011

The , Carderock Division (NSWCCD) has issued a Broad Agency Announcement (BAA) discussing Energy Conservation Applications for the U.S. Navy’s Military Sealift Command (MSC) Combat Logistics Force, Auxiliaries and Sealift ships. The BAA solicits innovative concepts for Navy shipboard energy conservation and carbon footprint reduction with the potential for rapid transition to Fleet operation.  The solicitation is BAA number N00167-11-BAA-01.  The Energy Conservation BAA will be open for two years and white papers may be submitted any time throughout the period beginning 1 December 2010 and ending 31 October 2012.  This BAA, more information and directions for submitting white papers to NSWCCD can be found at http://www.navsea.navy.mil/nswc/carderock/pub/business/baa.aspx.

 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Technology

Maritime Future Summit: Digital Shipping

Autonomous ships, smart on-board systems: At the Maritime Future Summit on September 5, industry leaders will discuss the future of shipping. For the first time

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

Subsea 7 Awarded $1bn Wind Farm Offshore UK Deal

Subsea 7 S.A. informed today the details of the major(1) contract award that was first announced on 20 May 2016 . The contract was awarded by Beatrice Offshore Windfarm Limited (BOWL)(2),

Navy

This Day In Naval History - May 24

1917 - The first U.S. convoy left Hampton Roads, Va. to cross the North Atlantic after entering World War I. During the 18 months of war while American vessels escort convoys through the war zone,

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Ingalls Christens Amphibious Transport Dock Portland

Ingalls Shipbuilding, a division of Huntington Ingalls Industries (HII), christened the amphibious transport dock Portland (LPD 27) on May 21 in front of approximately 1,000 guests.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0666 sec (15 req/sec)