Kashagan Consortium: Oil Production Not Expected in 2014

Posted by Michelle Howard
Monday, April 28, 2014
Kashagan Oilfield location. Photo: Uwe Dedering

 A consortium developing Kazakhstan's huge Kashagan oilfield said on Monday it did not expect to produce oil in the offshore field this year due to leaking pipelines.
 


"The current assessment, based on the results of an investigation, is that both the oil and the gas pipelines might have to be fully replaced," the consortium also said.



The North Caspian Operating Company (NCOC) consortium includes Eni, Exxon Mobil, Royal Dutch Shell , China's CNPC, Japan's Inpex and Kazakh state-run KazMunaiGas.


(Reporting by Raushan Nurshayeva; writing by Vladimir Soldatkin; Editing by Alessandra Prentice)

 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Energy

Deep Sea Supply takes Delivery of 'Sea Triumph'

The Deep Sea Supply  took delivery of the newbuilding Platform Supply Vessel 'Sea Triumph'  on Thursday 18 September.  The vessels 'Sea Triumph' is a STX 05-L

Tropical Storm Polo Threatens Battered Mexican Resort of Los Cabos

Tropical storm Polo barreled nearer on Friday to the Mexican Pacific resort of Los Cabos where thousands of troops were restoring order following widespread

Keystone XL Costs to Nearly Double - TransCanada

The total cost of TransCanada Corp's controversial Keystone XL pipeline is likely to nearly double following six years of regulatory delays, a company spokesman said on Friday.

News

Deep Sea Supply takes Delivery of 'Sea Triumph'

The Deep Sea Supply  took delivery of the newbuilding Platform Supply Vessel 'Sea Triumph'  on Thursday 18 September.  The vessels 'Sea Triumph' is a STX 05-L

Tropical Storm Polo Threatens Battered Mexican Resort of Los Cabos

Tropical storm Polo barreled nearer on Friday to the Mexican Pacific resort of Los Cabos where thousands of troops were restoring order following widespread

Keystone XL Costs to Nearly Double - TransCanada

The total cost of TransCanada Corp's controversial Keystone XL pipeline is likely to nearly double following six years of regulatory delays, a company spokesman said on Friday.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2227 sec (4 req/sec)