Ulstein Contract to Build Offshore Construction Vessel

Sunday, February 13, 2011
Image courtesy Ulstein Group

 Working closely with Eidesvik Offshore and their partner Subsea 7, Ulstein has signed a contract for delivering an offshore IMR/ construction vessel of the Ulstein SX148 design to Eidesvik Offshore.

 The yard and design department at Ulstein have worked on this project for more than two years. 
 
The ship is of the SX148 design from Ulstein, which can carry out highly advanced subsea work like inspection, maintenance and repair of oil installations on the sea bottom. Furthermore, the vessel can be used for clearing oil and gas wells and for well stimulation.
 
The moon pool is located centrally in the ship’s hangar, in an efficient layout providing a good and safe indoor work area on the main deck. The vessel is equipped with three ROVs: one for observation and two for operation. It also has an MHS (Module Handling System).
 
Also onboard is a 100-tonne AHC (Active Heave Compensated) offshore crane. It will be used mainly for lifting/lowering heavy equipment from/to the sea bottom. The vessel has a high freeboard – which means the work deck is high above the waterline, providing added safety for the deck crew.
 
The vessel is able to carry out demanding operations also under harsh weather conditions. The X-BOW® hull line design reduces hull motion from high waves, making it easier to keep on operating. 
 
Statoil’s operational demands require that the vessel has a good back-up system for much of the equipment and systems onboard. The vessel is also ice-reinforced for arctic conditions.
 
The vessel will be 349.5 ft long and 80.4 ft wide with a top speed of over 17 knots. It will be accommodating a crew of 90. The ship will be in service for operator Statoil on her completion at the end of 2012.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Japan's MHI Bags Indian Oil's LNG Storage Tank Contract

Indian Oil Corp (IOC) has awarded a contract to build two football stadium-sized liquefied natural gas (LNG) storage tanks at its upcoming Ennore LNG import terminal

Gazprom, Gasunie Sign Framework Agreement - LNG

At a Meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Han Fennema, CEO and Chairman of the Executive Board of Gasunie a Framework

De Nora Acquires Severn Trent's Water Purification Business

De Nora announces the completion of the acquisition of the Water Purification group of Severn Trent Services. The new business line, called De Nora Water Technologies,

Shipbuilding

KR Overhauls Hull Structure Software

IACS member classification society the Korean Register (KR) informs it has overhauled its SeaTrust-HullScan software package, a ship design support solution that analyzes and appraises a vessel’s.

Wärtsilä Propulsion for New Fishing Vessel

A new fishing vessel being built by Simek AS in Norway on behalf of the U.K. operator Antares (Whalsay) Fishing Company Ltd, will feature an integrated Wärtsilä

Dry Bulk Market Crisis: Opportunity or Threat?

The shipping industry is experiencing the biggest dry bulk market recession since the 1980s, as uncertain global economic outlook and increased imbalance between

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1194 sec (8 req/sec)