ChSY Finishes Construction of Trawler “General Troshev”

Friday, August 19, 2011
Gneral Troshev

Chernomorsky Shipbuilding Yard (Nikolaev) finished construction of big factory freezer trawler “General Troshev” for Russian company “Preobrazhenskaya Base of Trawling Fleet.

The vessel is intended for fishery by over-trawling and midwater trawling. The vessel is built on Russian Registry of Shipping and has unrestricted navigation.

“It is the first of four trawlers, with which we resume building of given types of vessels. The next vessel also will be built for Preobrazhenskaya Base of Trawling Fleet of Russia. The negotiations are conducting upon the others with potential customers, particularly the Russian ones. We consider given branch of shipbuilding as prospective”, - ChSY General Director Valery Kalashnikov commented finishing of construction.

Trawler’s design speed is 14,3 kt, displacement is 5715 t. The length of the vessel is 104,5 m, width is 16 m, moulded depth is 10,2 m, deadweight is 1757 t.

“To adapt a project to modern conditions, developed by Leningrad Central Design Bureau “Vostok” more than 30 years ago, turned out to be complicated, but the result surpassed all expectations. Daily output of fish production is succeeded to increase from 50 t to 150 t, fish-meal – from 7 t to 17 t. According to our specialists’ estimates, new big factory freezer trawlers will be found quite competitive on the modern market of fishing vessels”, - ChSY Chief Designer Sergey Khalnov mentioned.

Vice-chairman of regional state administration Viacheslav Rukomanov, managers of regional and town State government bodies and representatives of “Preobrazhenskaya Base of Trawling Fleet” company took part in festive ceremony of vessel’s delivery to the customer.

  • Information on trawler “General Troshev”

Main regions of trawler’s exploitation are temperate latitudes of seas of northern and southern hemispheres. Modern navigation aids and commercial connection are installed on board. Endurance of the trawler is 70 days.
Ready freezing production is stored in two holds at a temperature of -28°С and it can be transferred to the sea on transport refrigerators or can be delivered directly to the port. Main vessel’s energetic plant is diesel-geared unit of nominal power 6800 electric horsepower. As main engines two diesels are installed, manufactured under license of “Pielstick” firm. In correspondence with new international standards the vessel in equipped by special sanitary throughput area with ladies’ and men’s change rooms, tambour-gateway and washstands with contactless electronic control. Crew of the trawler is 96 persons. There are 2 suites, 12 single, 33 double, 43 quadruple cabins as well as a companion cabin and a crew’s mess room. 


People & Company News

MN100: Shock Mitigation

The Company: The company provides marine organizations, boat builders and equipment manufacturers with relevant subject matter expertise plus an independent overview

MN100: BlueTide Communications

The Company: BlueTide is a leader in the provisioning, implementation, monitoring and support of satellite equipment. Combining the power of HUGHES proprietary

Transas to Unveil the ‘Future of Maritime Operations’

Today's maritime industry requires realistic solutions and concepts for a modern, integrated operational infrastructure that delivers a sustainable, viable future,

Contracts

Austal Dives into Loss

Australia’s largest shipbuilder Austal posted a full year loss of $84.28 million because a program to build war ships for the US Navy took longer than expected.

Russian Shipbuilder Signs $1 bln Oil Rigs Contract with Iran

Russian shipbuilder Krasnye Barrikady and Iran's Tasdid Offshore Development Company (TODC)  have signed a deal worth $1 billion to build five offshore drilling

BP, ExxonMobil, ConocoPhillips 'Quit' Alaska LNG Project

BP, Conoco Phillips, and Exxon Mobil said that the 65-billion dollar megaproject would be too unprofitable for them to move into the next phase of development.

Shipbuilding

MN100: Shock Mitigation

The Company: The company provides marine organizations, boat builders and equipment manufacturers with relevant subject matter expertise plus an independent overview

Five Vessels Delivered for Qatar’s New Port Project

Nakilat Damen Shipyards Qatar (NDSQ) has delivered five vessels as part of an 11-vessel order for New Port Project (NPP). Built entirely at the Erhama Bin Jaber

New Tour Vessel for Mary D Cruises

A new high-end tour vessel is scheduled to be delivered to for Mary D Cruises of New Caledonia in late 2016.    Designed by Incat Crowther with styling reminiscent of a yacht,

Naval Architecture

MN100: Shock Mitigation

The Company: The company provides marine organizations, boat builders and equipment manufacturers with relevant subject matter expertise plus an independent overview

New Tour Vessel for Mary D Cruises

A new high-end tour vessel is scheduled to be delivered to for Mary D Cruises of New Caledonia in late 2016.    Designed by Incat Crowther with styling reminiscent of a yacht,

Hapag-Lloyd Cruises Orders Two Vessels

TUI Group, the world’s number one tourism group, will invest in two new-builds for its Hamburg-based subsidiary Hapag-Lloyd Cruises. The two, new, 5-star expedition

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2467 sec (4 req/sec)