BAE Systems Starts Construction on Dump

Press Release
Thursday, October 04, 2012
BAE Systems Mobile Shipyard

Scows for Great Lakes Dredge & Dock Company
 

BAE Systems has begun construction on the first of two dump scows for Great Lakes Dredge & Dock Company. Employees and executives from both companies gathered yesterday for a ceremony to mark the start of construction for the first module, which will weigh approximately 87 tons. When complete, the entire first vessel will weigh about 1,600 tons and measure 295 feet long and 62 feet wide, with a draft of 17 feet. The second vessel, which is scheduled to start in January, will be of the same dimensions and capacity. Both 7,500-cubic-yard, split bottom dump scows will be used to support U.S. dredging operations.


The design for the BAE Systems-built vessels was provided by Great Lakes and is based on similar dump scows in the United States and abroad. The new vessels will also be U.S. flagged.


“Our new commercial ship construction continues to grow at BAE Systems. Our team’s ability to manage and execute these new construction projects is due to our highly-skilled workforce, strong program management and the focus we place on building trusted partnerships with our customers,” said Vic Rhoades, director and general manager at BAE Systems Southeast Shipyards Alabama. “It’s a privilege to be working with Great Lakes Dredge & Dock, and we’re honored to have been selected to build and deliver these important vessels.”


Steve Becker, vice president and chief mechanical engineer at Great Lakes, added: "Great Lakes is excited to work with BAE Systems on this expansion of our fleet. The new class of scows being constructed encompass over three decades of Great Lakes’ experience in designing material handling barges. These scows will be an important component for key projects upcoming in the domestic dredging market. We recognize BAE Systems’ shipbuilding acumen and safe work environment, and we look forward to delivery of these scows and continued cooperation on future projects."


The contract demonstrates BAE Systems’ continued expansion in the commercial shipbuilding market. Recently, the company teamed with Mid Ocean Tanker Company and ALTERNA Capital to deliver the American Phoenix, a U.S. flag/Jones Act-qualified product chemical tanker. Measuring 616 feet long and 105 feet wide, it is the largest vessel ever built and launched in the State of Alabama. BAE Systems also marked a milestone last month with the keel laying of the MV Magdalen, a trailing suction hopper dredge that is scheduled to be delivered in 2014.


In addition to the vessels under construction in Mobile, BAE Systems announced in August that it was awarded a contract with GulfMark Americas to build two platform supply vessels, with an option for two additional vessels in the future. Construction on the first 288-foot-long platform supply vessel is expected to start in January.

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

Ship Repair & Conversion

More German Shipowners Look to Gibdock for Repairs

Gibdock remarks it has continued to see its stock rise amongst the German shipowner community over the past year. Indeed the Gibraltar ship repair yard’s recent

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

Dredging

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

Royal IHC Starts Building EasydredgeTM 2700

Royal IHC (IHC) is constructing the first vessel in its range of competitively priced standard trailing suction hopper dredgers (TSHD). It has started to build

Restoring the NY-NJ Harbor Estuary

Significant challenges often require a team effort. Restoring the New York-New Jersey Harbor Estuary is one of them. A group of professionals from the Army Corps of Engineers,

Great Lakes

Dool to Serve as Chair of SLSMC Board

The St. Lawrence Seaway Management Corporation (SLSMC) announced that Tim Dool has been named as Chair of the Board of Directors, effective September 1. Dool was

 
 
Maritime Careers / Shipboard Positions Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3113 sec (3 req/sec)