Construction to Start on New Damen Vinashin Shipyard

Friday, August 27, 2010
Photo courtesy Damen Shipyards Gorinchem

On 19 August 2010 the signing ceremony for the start of construction of the new shipbuilding facility of Damen Vinashin Shipyard in Haiphong, Vietnam took place in the head offices of the Vietnam Shipbuilding Industry Group (Vinashin) in Hanoi.

Nguyen Duy Hung, Vice Operations Director of Song Cam Shipyard signed together with Erik van der Noordaa, Chief Operations Officer of the Damen Shipyards Group in The Netherlands. Song Cam Shipyard has been allocated by Vinashin to act as the local partner in the construction and operation of the new shipyard which is a joint venture between Vinashin and Damen. Completion of the first phase of the project is planned for February 2012. In the first phase the shipyard will concentrate on the outfitting, under cover, of hulls built by Song Cam Shipyard. Capacity is approximately twelve vessels per year, all current orders are for export.

Facilities in the first phase include a Syncrolift of 2500 ton capacity, an outfitting hall of 80 metre by 40 metre and various workshops and offices. In the second phase of the five year plan the capacity will be increased to maximum 30 tugs, workboats and high speed craft per year in a dedicated outfitting hall of 160 metre by 150 metre. Sufficient room is available on the 42 hectare site for the construction of hulls as well as for sub-contractors and suppliers in the final phase of the five year plan.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fincantieri Invests In Camper & Nicholsons

Fincantieri has signed an agreement for the acquisition of a minority stake via capital injection in Camper & Nicholsons International (Camper & Nicholsons), the

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1092 sec (9 req/sec)