Hydrex on-site, making preparations for operation on 400-meter container vessel.

At the end of June, a Hydrex team replaced the three leaking bow thruster shaft seals of a 400-meter container ship in Gdansk, Poland. The operation was performed on-site and underwater using the company’s flexible mobdocks. The vessel was able to continue its commercial activities without any hindrance or delay.

Together with all the necessary equipment, the diver/technicians mobilized from the Hydrex fast response center in Antwerp to the vessel’s location. After they set up a monitoring station on the quay, the divers started the operation by removing the rope guard covering the thruster seals. They could then perform a detailed inspection of the seal assembly and make a good assessment of the damage.

The Hydrex flexible mobdocks were installed at both ends of the thruster tunnel. Next the team evacuated all water from the tunnel. In this manner a working environment with drydock-like conditions was created. This is essential for any permanent seal replacement. The divers removed the first seal and replaced it with a new one which was then bonded. This procedure was repeated with the other two damaged seals. All seals showed cuts at the underside, which had caused the oil leak.

The operation ended with succesful leakage tests, the reinstallation of the rope guard and the removal of the flexible mobdocks.

During the operation representatives of both the manufacturer of the shaft seals and the bow thruster OEM were present. They followed the operation and gave their approval.

Ultra large container vessels like this 400-meter one have a corresponding large thruster tunnel. This was however no problem because the Hydrex flexible mobdocks can be easily adapted  to the circumstance. They can be used for a wide range of repair or maintenance work on all types and sizes of thrusters and vessels.

By performing the operation on-site and underwater, the divers made it possible for the owner to keep his vessel out of drydock. This was extremely important because the ship was only six months old. The Hydrex team worked in shifts around the clock. They finished the job well before the crew had concluded the cargo operations. This allowed the ship to sail perfectly on schedule.

hydrex.be
 

  • Hydrex diver/technician taking the plunge.

    Hydrex diver/technician taking the plunge.

  • The old seals had cuts at the bottom, causing the leak.

    The old seals had cuts at the bottom, causing the leak.

  • Hydrex team member supervising the underwater operation.

    Hydrex team member supervising the underwater operation.

  • Diver/technician working on the shaft seal assembly.

    Diver/technician working on the shaft seal assembly.

  • New seal positioned and bonded.

    New seal positioned and bonded.

  • Divers getting ready for underwater operation.

    Divers getting ready for underwater operation.

  • A monitoring station was set-up  next to the vessel.

    A monitoring station was set-up next to the vessel.

  • Hydrex diver/technician taking the plunge.
  • The old seals had cuts at the bottom, causing the leak.
  • Hydrex team member supervising the underwater operation.
  • Diver/technician working on the shaft seal assembly.
  • New seal positioned and bonded.
  • Divers getting ready for underwater operation.
  • A monitoring station was set-up  next to the vessel.
Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

China’s Shipyards Face Tough Times

As the shipping market continues its prolonged downturn five shipyards have filed for bankruptcy this year, reports SCMP.   China's leading private shipyards

Ferguson to Build Two CalMac Ferries

Scottish minister Nicola Sturgeon have named Ferguson shipyard as the preferred bidder for a £97 million contract for the biggest new ferries on the Clyde since

Private Ship Repair Moves Dry Dock Timelines

A delay in private repairs to the hospital ship Africa Mercy has caused a two-and-a-half week adjustment of timelines for Transnet National Ports Authority’s R30

News

Dry Bulk Recovery Still a Long Way Off

The dry bulk shipping market will remain in recession due to contracting demand for iron ore and coal, and any recovery is not expected until 2017, according to

New Cutter Suction Dredge: Modern and Efficient

Ellicott Dredges, LLC has debuted a new design 20” (500 mm) cutter suction dredge, the Series 2070 Dragon dredge.    Aiming to take advantage of modern, up-to-date

Boat with 40 African Migrants Arrives on Spanish Island

A boat containing around 40 African migrants including a toddler girl landed on a beach on the Spanish island of Gran Canaria, sea rescue services said on Wednesday.

Underwater Engineering

SMOE Wins $1bln Multi-platform Culzean Contract

Singapore's offshore services provider Sembcorp Marine has won an engineering, procurement and construction (EPC) contract worth over USD1 billion for the Culzean

Historic WW I Shipwreck Survey Underway

Partnering U.S. agencies have commenced surveying the historic shipwreck of an American lightship shelled and sunk by a German U-boat during World War I nearly 100 years ago.

HMAS Canberra Initial Operational Capability

The Royal Australian Navy’s Amphibious Ship, HMAS Canberra, has completed a graduated operational test and trials program to achieve a key milestone towards Initial Operating Capability.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.9126 sec (1 req/sec)