Salazar Directs Deepwater Oil & Gas Containment Exercise

BSEE
Thursday, May 24, 2012

MWCC to Deploy Capping Stack for Exercise in the Gulf.
  
As part of the Obama administration’s ongoing efforts to strengthen the oil and gas industry’s ability to respond in the event of a deepwater blowout and ensure that offshore oil and gas production can continue to expand safely and responsibly, Secretary of the Interior Ken Salazar today charged the Marine Well Containment Company (MWCC) with conducting a live drill this summer to deploy critical pieces of state-of-the-art well control equipment in the Gulf of Mexico.

 

The exercise would demonstrate the ability of MWCC to mobilize a capping stack – a device similar to the one that stopped the flow of oil from the Deepwater Horizon’s well – in a timely fashion from its on-shore base to the deep water seabed of the Gulf.

 

This first-of-its-kind exercise will be overseen by Interior’s Bureau of Safety and Environmental Enforcement (BSEE), which tests capping stacks on the surface as part of its overall responsibility to enforce the tougher offshore safety requirements implemented in response to the Deepwater Horizon explosion and oil spill. 
 
 

“In the wake of the Deepwater Horizon explosion and oil spill, we undertook the most aggressive and comprehensive reforms to offshore oil and gas oversight in U.S. history, including requiring the industry to have immediate access to equipment and technologies that could stop another blowout,” said Salazar. “Our safety reforms are designed to reduce the chances that a capping stack would ever be needed again, but one thing Deepwater Horizon taught us is that you must always be ready to respond to the worst case scenario. This exercise is an opportunity to deploy systems, test readiness, and train under real-time conditions.”

 

“BSEE has made great strides in developing an effective and strong regulatory framework to support the offshore oil and gas program,” BSEE Director James Watson said. “We have tested MWCC and capping stacks repeatedly, but putting them through their paces in the deep waters of the Gulf will give us added confidence that they will be ready to go if needed.”

 

MWCC is one of two consortia that provide contract access to well containment equipment to oil and gas operators in the Gulf of Mexico. This equipment is required by BSEE for drilling with subsea blowout preventers in deepwater, among other situations. The other consortium, the Helix Well Containment Group, will complete a similar deployment exercise in the future.

 

The demonstration will involve the field deployment and testing of a capping stack as part of a larger scenario that will also test an operator’s ability to obtain and schedule the deployment of the supporting systems necessary for successful containment – including debris removal equipment and oil collection devices, such as top hats. The capping stack will be lowered to the seabed by wire, a technique that offers the potential to be significantly faster than the deployment via pipe that occurred during the Deepwater Horizon response.

 

As part of the exercise, BSEE will also analyze the results from tests conducted on the sea floor. In October 2010, Secretary Salazar required that prior to receiving approval of a deepwater drilling permit, an operator must demonstrate that it has enforceable obligations that ensure that containment resources are available promptly in the event of a deepwater blowout.
 

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

CWind Joins National Workboat Association

Citing crew transfer services as an integral part of its offering, offshore wind industry service provider CWind announced it is now a member of the National Workboat Association (NWA) of the U.

BG Group Starts up Sixth FPSO in the Santos Basin

BG Group announced first oil from the Cidade de Itaguaí floating, production, storage and offloading (FPSO) vessel, the sixth unit to start production across the

BG Awards Fugro MBES, Seabed Coring Contract

Fugro has been awarded a contract by BG International Limited Sucursal Honduras to conduct an integrated multibeam echosounder (MBES) survey and seabed coring campaign

Environmental

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

NYK Hosts Safety Conference

Over three dates in July, NYK hosted a safety promotion conference for shipowners and ship-management companies at the NYK head office in Tokyo and at Imabari city in Ehime prefecture.

El Nino Onset May Impact Panama Canal Drafts

The Panama Canal Authority closely monitors the water levels of Gatun and Alhajuela lakes on a regular basis due to the importance that these resources have for transit operations.

Energy

S.Africa Considering Ship-Based Power Generation

South Africa could deploy power barges using gas to generate electricity to help overcome chronic supply shortages, a senior government official said on Tuesday.

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Koole Expands Rotterdam Operations

Koole Terminals has begun operations at the storage facility for petrol and diesel in Pernis that it recently acquired from BP.   The companies have a long-standing relationship.

Maritime Safety

Asian Nations Call for Stop to South China Sea Land Work

Calls grow for China to halt land reclamation. Southeast Asian countries on Tuesday backed a U.S. call to halt land reclamation in the South China Sea, underlining

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

FMC Collects $1,227,500 in Penalties from NVOCC's

Federal Maritime Commission Chairman Mario Cordero announced that the Commission has completed compromise agreements recovering a total of $1,227,500 in civil penalties.

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1635 sec (6 req/sec)