Statoil Awards Aker a Contract for New Type of Rig

Press Release
Wednesday, April 18, 2012
A prototype of a Cat B rig installation (Photo: Statoil).

Statoil is awarding Aker Solutions a contract today for hiring of an entirely new type of rig, which represents an important technological advance for the industry.

The category B rig will represent an important contribution toward increasing recovery from existing fields. The rig with associated integrated services is expected to reduce operating costs for well intervention by as much as 40 percent.

Development of technology for increasing the recovery from operating fields is an area of commitment for Statoil. For the last year, the average oil recovery rate from Statoil-operated fields has risen from 49 percent to 50 percent.

The category B rig is designed and equipped for the industrialization of drilling and intervention services in existing production wells and represents a new service.

“This will be a very important part of the tool box for increased recovery on the Norwegian continental shelf, making it possible to produce oil and gas which otherwise would be lost,” said Statoil executive vice president of Technology, Projects and Drilling, Margareth Øvrum. “The category B rig is the result of long-term, targeted technology development to increase subsea well recovery rates.”

In cooperation with the supplier industry, Statoil has developed a new type of rig and well control system specially adapted to carry out well intervention and drilling operations in existing subsea wells.

This type of rig fills the gap between light intervention vessels (category A) and conventional rigs (category C).

The category B design with integrated services is based on Aker Solutions’ own studies with a background in Statoil specifications. The rig type is designed for year-round well service in Statoil-operated activities.

The category B design provides the option for a number of different types of well interventions using wire line and coiled tubing operations.

This type of rig is also designed to carry out sidetrack drilling from production tubing (through tubing drilling – TTD) in a manner that allows simultaneous production from both the new sidetrack and existing production tubing. The well services are conducted through existing subsea Christmas trees.

The key to maintaining the current production level on the Norwegian continental shelf (NCS) is increased recovery from existing fields, along with the development of new fields. Increasing drilling activity on mature fields is important in order to achieve the NCS’ full potential.
Statoil and the licensees will enter into an eight-year contract with options for three times two years for the category B service. The estimated value of the contract is USD 1.9 billion. In addition to rig rental, the contract also includes rental of the necessary equipment and services to carry out well intervention, sidetrack drilling, ROV operations, well testing and cementing.

The rig will be in service in 2015.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Furuno Establishes China Subsidiary

FURUNO ELECTRIC CO., LTD. announced that its new subsidiary in Hong Kong has been established and has commenced business operation on February 1, 2016.   The new subsidiary, FURUNO CHINA CO.

Edison Chouest Opening Mississippi Shipyard

Edison Chouest Offshore locating shipbuilding operations, TopShip, LLC, in Gulfport, Miss.   Gov. Phil Bryant and officials from Edison Chouest Offshore, an offshore

R&M Group Merges with Sea Level Marine

R&M Ship Technologies USA, Inc. has merged Sea Level Marine, LLC. in efforts to increase the range of services offered to the company’s global client base. By aligning resources,

Technology

Novoship to Install Ecochlor BWTS on 4 Tankers

SCF Novoship Technical Management has selected the Ecochlor Ballast Water Treatment System (BWTS) to be retrofitted on three Aframax Oil Tankers and one Product Carrier.

DCNS Deploys 3DEXPERIENCE Solution

Dassault Systèmes and DCNS partner on the 3DEXPERIENCE innovation platform for next generation naval defense solutions   Multi-disciplinary, Collaborative Innovation

Hapag-Lloyd Sees Uptick of Incorrectly Declared Dangerous Goods

Year-on-year increase of 65 percent; more than 4,300 cases worldwide   Container shipper Hapag-Lloyd said it registered considerably more incorrectly declared dangerous goods last year,

Contracts

Novoship to Install Ecochlor BWTS on 4 Tankers

SCF Novoship Technical Management has selected the Ecochlor Ballast Water Treatment System (BWTS) to be retrofitted on three Aframax Oil Tankers and one Product Carrier.

Optimarin Breaks into the Fishing Market

Ballast water treatment (BWT) specialist Optimarin has landed its first ever contract in the fishing segment. The Norwegian firm will now supply its soon to be

ALMACO Wins Statoil Order for 450 Cabins

ALMACO Group was awarded the contract to build 450 NORSOK-compliant Modular Cabins for Statoil’s Johan Sverdrup fixed platform at Apply Leirvik’s yard in Stord, Norway.

Offshore

ALMACO Wins Statoil Order for 450 Cabins

ALMACO Group was awarded the contract to build 450 NORSOK-compliant Modular Cabins for Statoil’s Johan Sverdrup fixed platform at Apply Leirvik’s yard in Stord, Norway.

Three Dead on Pemex Platform, Fire Under Control

Three workers were killed and at least seven injured when a fire broke out on a Pemex oil processing platform in the Gulf of Mexico, but the latest in a string of incidents is now under control,

Topaz Responder Saves Refugee Migrants

Topaz Energy and Marine has emerged as an unlikely player in the effort to save refugee migrants risking their lives on the sea crossing from Turkey to Greece’s islands in order to reach Europe.

Energy

ALMACO Wins Statoil Order for 450 Cabins

ALMACO Group was awarded the contract to build 450 NORSOK-compliant Modular Cabins for Statoil’s Johan Sverdrup fixed platform at Apply Leirvik’s yard in Stord, Norway.

Oversupplied Market Eyes Floating Storage Opportunities

Brent oil price reached lows of $27/bbl in mid-January, but has recovered over the past two weeks to above the $30/bbl mark. Nevertheless, volatility is expected

Three Dead on Pemex Platform, Fire Under Control

Three workers were killed and at least seven injured when a fire broke out on a Pemex oil processing platform in the Gulf of Mexico, but the latest in a string of incidents is now under control,

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1199 sec (8 req/sec)