BAE Systems Contracted to Evaluate USMC Amphibious Vehicles

Press Release
Sunday, August 26, 2012
Photo credit BAE Systems

BAE Systems to help U.S. Marine Corps determine the future of its amphibious vehicle fleet under two contracts.

The contracts are in regard to the Assault Amphibious Vehicle (AAV) and Marine Personnel Carrier (MPC).

The work includes conducting a trade study to evaluate improvements to the AAV and delivering MPC sample vehicles and hulls to be used for demonstrations of water mobility, blast protection and Human Factors Engineering.

The AAV trade study will allow BAE Systems to propose how to best improve the survivability and force protection of the vehicle while maintaining its current land and water mobility characteristics. Through this $250,000 contract, BAE Systems will determine if an affordable development and production unit cost can be realized using a production schedule that fields 43 upgraded vehicles by September 2017.

Work for the AAV upgrade efforts will be performed primarily at BAE Systems’ Santa Clara, California and Stafford, Virginia facilities.  Additional work may be done through York, Pennsylvania; Fridley, Minnesota and Sterling Heights, Michigan.

BAE Systems will provide its findings in December 2012. After completion of the trade study and design phase, it is expected that a Request for Proposal for full AAV upgrade development will follow.

BAE Systems has also been awarded a $3.5 million contract to support the USMC’s evaluation of  the MPC through system demonstrations and studies for water performance, human factors, stowage capacity evaluation, survivability testing and the potential for future production in the U.S. The MPC is an amphibious 8x8 wheeled personnel carrier, designed to provide expeditionary protected mobility and general support lift to the Marine infantry battalion.

Over the next eight months, a swim demonstration vehicle will be delivered to the Amphibious Vehicle Test Branch in Camp Pendleton, California and two vehicle hulls for blast testing will be delivered to the Nevada Automotive Test Center in Carson City, Nevada. Evaluation of the delivered assets is expected to begin in March 2013, with anticipated completion in August 2013. These assessments will be used by the Marines to validate and refine the program for further acquisition milestones.





 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

French PM: Aussie Subs to be built in Australia

French Prime Minister Manuel Valls said on Monday he was committed to building all of a new Australian submarine fleet in Australia, apparently contradicting the

Asia-N.Europe Box Rates Jump 170 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe jumped 170 percent to $732 per 20-foot container (TEU) in the week ended on Friday,

NAT Acquires Four 150,000dwt Tankers

Nordic American Tankers Limited ("NAT" or the "Company") announced today that it has entered into an agreement to acquire four existing Suezmax sister vessels built in Japan at a world-class shipyard.

Eye on the Navy

BAE Systems Bags USN Award for Submarine Propulsors

BAE Systems has received a $72 million contract from the U.S. Navy to produce and deliver propulsor systems for Block IV Virginia-class (SSN 774) submarines. The

This Day In Naval History: May 2

1863 - During the Civil War, the steam screw sloop Sacramento, commanded by Captain Charles S. Boggs, seizes the British blockade-runner Wanderer off Murrells Inlet, N.

VDRs Refit on UK Royal Fleet Auxiliary Ships

Danelec Marine informs it has supplied new-generation Voyage Data Recorders (VDRs) for three U.K. Royal Fleet Auxiliary (RFA) Bay-Class Landing Ship Dock (LSD) vessels.

Consulting

ICS Criticises 'Prestige’ Judgement by Spanish Court

At a meeting of the International Oil Pollution Compensation Funds (IOPCF) this week, the International Chamber of Shipping (ICS) has strongly criticised the judgement

V.Ships Wins Fortress Deal

V.Ships Offshore, part of V.Group has been awarded a ship management contract by Fortress Transportation and Infrastructure Investors LLC to provide full technical

Maersk Cuts Landing Certificate Issuance Time

* Maersk Line will introduce a simplified process for obtaining the Landing Certificates from May 1st , 2016   * Maersk line waives off the  Landing Certificate fee of INR 1000 Mumbai,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1037 sec (10 req/sec)