BAE Systems Contracted to Evaluate USMC Amphibious Vehicles

Press Release
Sunday, August 26, 2012
Photo credit BAE Systems

BAE Systems to help U.S. Marine Corps determine the future of its amphibious vehicle fleet under two contracts.

The contracts are in regard to the Assault Amphibious Vehicle (AAV) and Marine Personnel Carrier (MPC).

The work includes conducting a trade study to evaluate improvements to the AAV and delivering MPC sample vehicles and hulls to be used for demonstrations of water mobility, blast protection and Human Factors Engineering.

The AAV trade study will allow BAE Systems to propose how to best improve the survivability and force protection of the vehicle while maintaining its current land and water mobility characteristics. Through this $250,000 contract, BAE Systems will determine if an affordable development and production unit cost can be realized using a production schedule that fields 43 upgraded vehicles by September 2017.

Work for the AAV upgrade efforts will be performed primarily at BAE Systems’ Santa Clara, California and Stafford, Virginia facilities.  Additional work may be done through York, Pennsylvania; Fridley, Minnesota and Sterling Heights, Michigan.

BAE Systems will provide its findings in December 2012. After completion of the trade study and design phase, it is expected that a Request for Proposal for full AAV upgrade development will follow.

BAE Systems has also been awarded a $3.5 million contract to support the USMC’s evaluation of  the MPC through system demonstrations and studies for water performance, human factors, stowage capacity evaluation, survivability testing and the potential for future production in the U.S. The MPC is an amphibious 8x8 wheeled personnel carrier, designed to provide expeditionary protected mobility and general support lift to the Marine infantry battalion.

Over the next eight months, a swim demonstration vehicle will be delivered to the Amphibious Vehicle Test Branch in Camp Pendleton, California and two vehicle hulls for blast testing will be delivered to the Nevada Automotive Test Center in Carson City, Nevada. Evaluation of the delivered assets is expected to begin in March 2013, with anticipated completion in August 2013. These assessments will be used by the Marines to validate and refine the program for further acquisition milestones.





 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Chassis Pools for Port of Long Beach

Three companies that own the vast majority of chassis serving the San Pedro Bay ports are on track to activate a “gray chassis fleet” of truck-trailers on March 1,

Davie Building LNG-powered Ferries

Canadian shipbuilder Davie held a keel laying ceremony for MV Armand-Imbeau II, marking the beginning of the hull assembly for this first of two sisterships under

Lithuania Looks to U.S. for Gas

Lithuanian liquefied natural gas (LNG) importer Litgas has signed a preliminary agreement with a U.S. supplier, looking to lessen the Baltic nation's dependence on Russia.

Eye on the Navy

Italy to Begin Naval Exercises off Libya

Italy will begin annual naval exercises this week near the coast of Libya, where a breakdown in order has allowed tens of thousands of migrants to try to reach

Canadian Submarines Ready to Hit the Sea

For the first time since they were purchased in 1998, the Royal Canadian Navy has reached a stage where three of its four diesel-electric submarines are now shipshape and available for operations.

China's Maritime Advances Worry US

The Director of U.S. National Intelligence, James Clapper, has expressed his concern at the progress of China in maritime zones it shares with its neighbors, accused

Consulting

India to Appoint Coastal Shipping Consultant

As part of Narendra Modi government plan to promote coastal shipping, India is all set to appoint a consultancy firm to assist the Shipping Ministry.    The

ST Engineering Y-O-Y Profits Slip

Singapore Technologies Engineering Ltd  reported today its full year financial results ended 31 December 2014 (FY2014) with a Group revenue of $6.54b compared to $6.

USCG Foundation Announces Scholarships

The Coast Guard Foundation, a non-profit organization committed to the education and welfare of Coast Guard members and their families, announced today that

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2056 sec (5 req/sec)