WR Contracted for CDSADN Services

MarineLink.com
Wednesday, April 09, 2014

WR Systems, Ltd. of Norfolk, Va. has been awarded a delivery order on the SeaPort-e contract with NSWC, Dahlgren Division for support services to Combat Direction Systems Activity, Dam Neck (CDSADN) Rapid Response Engineering Capability in the areas of software, hardware, network engineering and technical services. WR will provide support services in the development and refinement of prototype and test articles and provide services required to document and support these products, related subsystems and components.

This contract is the follow-on to WR’s Prime contract for Common Mobility Services (CMS) with CDSADN that was awarded in 2007. This new contract has a Base Period of twelve months, plus two Option Periods each consisting of twelve months, and an additional two Award-Term Options consisting of twelve months each, for a total of sixty months. The contract, #N00178-05-D-4654-0003, has a total potential value (including base and options) of $34,393,780.

wrsystems.com
 


People & Company News

MN100: MarineCFO

The Company: Founded in 1992, UA Business Solutions was a pioneer in the field of Enterprise Resource Planning (ERP) and an early Microsoft Partner. The ERP evolution

MN100: All American Marine, Inc.

The Company: All American Marine Inc. was founded in 1987 and specializes in the construction of custom tailored aluminum boats from 30 to 150 feet LOA. Today,

Five Minutes with Paul Switzer

Five minutes with Paul Switzer - Manager, Shipbuilding & Offshore, Viega   For readers not familiar with Viega, please give a ‘birds eye’ view, putting the company

News

US Navy Ships Conduct Astern Replenishment-at-sea

“While replenishments-at-sea are routine, astern refueling is unique and requires precise navigation and coordination,” said Lt. Cmdr. Jason Ileto, fleet replenishment scheduler for Commander,

US Offshore Lease Sale Yields $18 Mln in High Bids

Today’s U.S. oil and gas Lease Sale 248 garnered $18,067,020 in high bids for 24 tracts covering 138,240 acres in the Western Gulf of Mexico Planning Area, announced

Another Hurdle for The Ocean Alliance

Commissioner William P. Doyle of the U.S. Federal Maritime Commission today voted in favor of requesting additional information from The Ocean Alliance parties.

Marine Equipment

Better Turbocharger Performance, Proven Tech

Engineer wisdom: Nothing is worse as the right idea at the wrong time. But with the new ECOCHARGE Two-Stage Turbocharging System MAN D&T has reached both goals.

Royal IHC Upgrades TSHD Pump for Van Oord

Royal IHC informs it has completed the upgrade of the underwater pump and jet water system on trailing suction hopper dredger (TSHD) VOLVOX TERRANOVA for Van Oord.

ACE Winches Bags Order from Vard

Deck machinery specialist ACE Winches said it has been awarded a spooling contract with Vard Group AS for Norway’s largest construction vessel.   The scope of work includes the spooling of two 3,

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0994 sec (10 req/sec)