Bibby Secures Two More Offshore Contracts

By Eric Haun
Monday, August 04, 2014
FPSO vessel OSX 2, working in conjunction with Tecnomar & Associates

Bibby Ship Management announced it has secured two new contracts in the offshore oil and gas sector.

Bibby Ship Management Singapore has been appointed as the technical and crewing managers for the OSX 2, an FPSO vessel, working in conjunction with overall project managers Tecnomar & Associates. The office has also secured a contract with Global Samson to take over the management of two Platform Supply Vessels, the newbuild Ocean Turquoise 1 and another vessel which is currently being finalized.

The contract wins come on the back of Bibby Ship Management securing a contract to supply crew management services to Chevron North Sea’s Alba-FSU.

bibbyshipmanagement.com
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Asia Tanker, VLCC Rates Could Climb

Charterers to release 30 Middle East VLCC cargoes next week. VLCC market buoyed by upbeat Suezmax, Aframax sectors. Rates for very large crude carriers (VLCCs)

Energy

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

News

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Offshore Energy

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Update: Explosion in the Gulf of Mexico

An explosion occurred aboard a production platform Thursday at West Delta 105, operated by Fieldwood Energy, resulting in one fatality and three injured. The Bureau

Deepwater Semi-Sub COSL Prospector Delivered

COSLProspector, the fourth deep-water semi-submersible drilling rig built by CIMC Raffles for China Oilfield Services Limited (COSL), has been delivered in Yantai, Shandong Province.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1440 sec (7 req/sec)