NSR Rescue & Salvage Ship Contracts for Nordic Yards

Press Release
Monday, December 31, 2012
An Ice-class Nordic Yards-built Vessel: Photo credit Nordic Yards

Nordic Yards in Wismar and Warnemünde, Germany, contracted to build two ice-breaking rescue & salvage ships for Russia.

The vessels for the Russian Ministry of Transport, will operate on the Northern Sea Route (NSR)  in the Arctic, namely in the region of Murmansk, and in Sakhalin.

The vessels will be used for patrols and rescue operations in offshore oil and gas fields. They are highly specialised, have a complex level of equipment and are designed for searching for and rescuing ships in distress, evacuating people and providing them with medical care. They are icebreakers of the second highest ice class, which are designed for the Arctic and therefore suitable for rescue operations in harsh environments. They can be used both for ice- breaking operations in harbours and waters with an ice thickness of one metre as well as for fire-fighting and combating oil spills from the sea.

Due to their specialised equipment, the vessels can study the ocean floor and damaged objects at depths of up to 1,000 metres. Both will furthermore be equipped with a helipad on the bow.

The engineering and start of construction will take place in 2013. Delivery of the 86 metres long and 19 metres wide vessels is planned for spring 2015.

Financing will be provided by the Russian state and has already been secured for both projects. The total volume of the orders is 150-million euros.

The Nordic Yards shipyards in Wismar and Warnemünde are amongst the most modern, efficient and largest of their type worldwide. At the same time they build on a tradition that goes back many years. Since their foundation in 1946 over 900 seagoing ships in 74 different designs have been built there.
 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

Arctic Operations

IMO Adopts Polar Code Environmental Provisions

United Nations' International Maritime Organization (IMO) has adopted the environmental part of the Polar Code. Hereby, internationally binding regulations on

Global Warming Slowdown Tracked to Indian Ocean

Global surface warming has slowed since the start of the twenty-first century, while Pacific heat uptake was enhanced. Analyses of ocean heat content suggest that

Polar Science Gets a Boost From EU

The €2 million five-year EU-PolarNet programme brings together 22 of Europe’s internationally-respected multi-disciplinary research institutions to develop and

 
 
Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2019 sec (5 req/sec)