Davy Crockett Deconstruction

Thursday, May 26, 2011

The 433-foot flat deck barge Davy Crockett continues disassembly on the Columbia River, Wash., Ore., border on May 20, 2011. Metal is cut away from the floating stern section, transferred to a decontamination barge and then to a scrap barge to be hauled away. Meanwhile salvage divers prepare submerged areas for disassembly. U.S. Coast Guard photo by Petty Officer 2nd Class Eric J. Chandler.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Ship Recycling Experts Gather in Tokyo

Top ship recycling experts from around the globe gathered in Tokyo on December 10 at the ClassNK Ship Recycling Seminar to discuss the latest updates to the EU

NZ Report: Human Error to Blame for Rena Grounding

New Zealand's Transport Accident Investigation Commission (TAIC) published its final report into the grounding of containership Rena in October 2011. The TAIC’s

Workboats: Communications is Key Operational Tech

As we close out yet another year, I am constantly amazed at how much things change on the waterfront and the boats that ply the adjacent waters. Similarly, I like

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1318 sec (8 req/sec)