BOEMRE Approves 15th Deepwater Well

Press Release
Wednesday, June 01, 2011

For those of you keeping track, today the Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) approved a drilling permit for the fifteenth deepwater well to comply with rigorous new safety standards implemented in the wake of the Deepwater Horizon explosion and resulting oil spill. This includes satisfying the requirement to demonstrate the capacity to contain a subsea blowout.

The approved permit is for BHP Billiton Petroleum (GOM) Inc. to drill a new development well in Green Canyon Block 653 in 4,232 feet water depth, approximately 120 miles off the Louisiana shoreline, south of Houma. Today's approval is for a new well being drilled under a Development Operations Coordination Document that was approved on May 31, 2011, for which BOEMRE completed a site-specific Environmental Assessment.

Source: Boemre

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

Floating Production: $1.2b Speculative FLNG Ordered

The floating production business continues to be very strong, particularly in the LNG gas processing sector.  Last month saw a speculatively ordered floating liquefaction plant – a $1.

FLNG Prelude: A New Dawn in the Age of Maritime & Energy

Longer than four football fields, as big as six Nimitz-class aircraft carriers and almost as tall as the Taipei 101 skyscraper, Royal Dutch Shell PLC is hoping that its record-setting,

Energy

Mass Flow Metering System for MFO delivery in Singapore

As the world's leading bunkering port Singapore is to provide quality bunkering services to vessels lifting bunkers in the port. The use of the Mass Flow Metering

New Standard gets Revised Program for Cooper Basin Approved

New Standard Energy Limited (New Standard) advises that it has received approval for amendments to its five year work program in PEL570 in the Cooper Basin. As part of the revised program,

BP Reports Better Second Quarter 2014 Results

BP today announced its financial results for the second quarter of 2014. Underlying replacement cost profit for the quarter of 2014 was $3.6 billion, 34% higher than the $2.

Government Update

Mass Flow Metering System for MFO delivery in Singapore

As the world's leading bunkering port Singapore is to provide quality bunkering services to vessels lifting bunkers in the port. The use of the Mass Flow Metering

Iraq's Kurds Have Right to Sell Oil While Squeezed by Baghdad

Iraq's Kurdish region has the right to keep selling oil as long as the Baghdad government keeps cutting its budget, the head of the Kurdish parliament's energy committee said on Tuesday,

Russia, China May Develop Floating Nuclear Power Plants

Russia and the world's top energy user China may jointly develop six floating nuclear power plants (NPPs), Russia's nuclear export body said on Tuesday, a further

 
 
Maritime Security Maritime Standards Naval Architecture Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1812 sec (6 req/sec)