BOEMRE Calls for Public Comment, New Deepwater EA

Monday, April 25, 2011

The Bureau of Ocean Energy Management, Regulation and Enforcement (BOEMRE) announced that public comment is invited with respect to an Environmental Assessment (EA) for a supplemental Exploration Plan (EP) submitted by Hess Corporation. This supplemental EP involves deepwater activity in the Gulf of Mexico and will be completed in accordance with new safety and environmental standards implemented since the Deepwater Horizon explosion and oil spill.

 
The Supplemental EP includes three proposed exploratory wells in approximately 4,036 feet water depth, approximately 130 miles offshore Louisiana. Consistent with federal regulations, an EP is deemed “submitted” once all supporting materials and documentation has been provided. Once a plan is deemed submitted, BOEMRE has 30 calendar days to analyze and evaluate it.  For more information on pending plans, go to: http://www.gomr.boemre.gov/homepg/offshore/safety/well_permits.html
 
As part of its review, the bureau will prepare an EA specific to the proposed exploration activities. Upon completion of the technical and environmental review, BOEMRE must decide whether to approve the plan, require modifications, or disapprove the plan. An exploration plan describes all exploration activities planned by the operator for a specific lease or leases, including the timing of these activities, information concerning drilling vessels, the location of each planned well, and other relevant information that needs to meet important safety standards.
 
The 30-day time frame for review includes a 10-day public comment period to allow an opportunity to review and comment on the issues that should be considered by BOEMRE in preparing the EA for the plan. In an effort to make the comment opportunity more accessible, the public can both view and provide comments on agency documents at: http://www.boemre.gov/PublicComment.htm
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

BP Gulf Spill Trial Set For January

The high-stakes penalty phase of BP's trial over its role in the 2010 U.S. Gulf of Mexico oil spill will start next January, court officials said on Tuesday,

North Sea Maintenance Offsets Lack of Sales to Asia

North Sea Forties crude differentials were unchanged on Tuesday in light trade, supported by upcoming North Sea maintenance, but the forward curve weakened due

Saipem: A Fleet Grows in Brazil

As some pre-salt plays begin production, a wide range of subsea infrastructure is being built, with O&G transportation pipeline grids being one of the vital downstream systems.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Salvage Ship Electronics Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1364 sec (7 req/sec)