Gold Dredging Vessel Delivered

Sunday, September 30, 2012
Gold Dredger: Photo credit Art Anderson Associates

The 50-foot vessel, designed by Anderson Associates, & built by Pacifica has been delivered for gold dredging near Nome, Alaska.

Anderson Associates, a Bremerton-based multidisciplinary engineering services firm, recently completed design of a new dredge vessel for Pacifica, a Seattle-based vehicle assembler.

The vessel was designed specifically to meet the unique requirements of sub-surface dredging operations in the remote coastal waters of the Bering Sea, and is powered by twin 300HP Yamaha outboards.  It features a custom-designed bow for cutting through the rough seas and all pump, sluice and crane systems to conduct its gold dredging mission. 

“This was a fun project in that we were able to learn quite a bit about the gold dredging business, the unique equipment involved with it, all while applying the engineering skills we enjoy,” said Ben Anderson, Naval Architect and Project Manager for Art Anderson Associates.

Interest in offshore gold dredging has grown significantly, driven by high gold prices, recent offshore lease sales by the State of Alaska, and the popularity of TV programs such as the Discovery Channel’s Bering Sea Gold. 

The lease sales have driven a higher degree of professionalism among dredging companies, with the result that many builders are now more directly engaging engineering consultants like Art Anderson Associates.  Pacifica Project Manager Rod Gleysteen illustrated this trend in an email, saying “I am guessing that we are the first people to ever spend five dollars to have a marine engineer look at the rig.” 

 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ecuador Coastguard Orders Damen Patrol Boats

Damen announced it has recently signed a contract with AstillerosNavalesEcuatorianos (Astinave) to construct two Damen Stan Patrols (Spa) 5009 for the Ecuadorian Coastguard.

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

MN 100: Brunswick Commercial and Government Products

420 Megan Z. Ave Edgewater, FL 32132 Telephone: 386 423 2934 E-mail: kelsey.nemeth@whaler.com Website: www.brunswickcgp.com CEO/President: Huw Bower Number

Dredging

Dredge Yard to Participate in Latin American Congress of Ports

Dredge Yard announced it will for the first time participate in the Latin American Congress of Ports that will be held in less than a week in Puerto Iguazú in Argentina.

Odebrecht JV Wins $1.3b Colombia Waterway Contract

Colombia awarded a 2.5 trillion peso ($1.33 billion) contract to a consortium led by Brazil's Odebrecht SA on Friday to improve navigability on the Magdalena River,

Canada Announces Harbor Investments

The Harper Government invests in Mamainse and Kinoosao Harbors Bryan Hayes, Member of Parliament for Sault Ste. Marie, on behalf of the Honorable Gail Shea, Minister of Fisheries and Oceans,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1841 sec (5 req/sec)