Port of Odense Takes Delivery of LHM 550 Crane

Thursday, August 04, 2011

In May 2011, Port of Odense took delivery of a new Liebherr mobile harbor crane, type LHM 550. With a total height of 74 meters, the crane is more than twice as high as the famous Round Tower in Copenhagen. The LHM 550 was designed to lift up to 150 tons in hook operation and to handle all types of general cargo, containers and bulk commodities.
Operations take place at Odense Port Terminal at Lindø, which is one of Denmark’s most central transport areas for heavy and voluminous cargo. The crane, equipped with a Pactronic® hybrid drive system, has now passed the trial period and demonstrated that substantial benefits for the port could be achieved.


Ports

Vitol's Malaysia Terminal Suspends Ops after Spill

VTTI, the storage unit of world's largest oil trader Vitol, has suspended operations at its terminal in southern Malaysia following an oil spill, two industry sources said on Friday.

Shenzhen Port to Adopt China ECA Regulation

China's Shenzhen port is set to to adopt requirements for ships at berth requiring to burn marine fuel with sulfur content not exceeding 0.5 percent starting October this year,

Cochin Port Gets a Little 'Breathing Space'

The Cabinet Committee on Economic Affairs of India, chaired by the Prime Minister Narendra Modi, has given its approval for waiver of penal interest on Government

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1172 sec (9 req/sec)