DoD, Navy and Wind Farm Developer Release Memo of Agreement

Press Release
Thursday, April 19, 2012

By Kenneth Hess, Chief of Naval Operations Energy and Environmental Readiness Division Public Affairs

Naval Air Station, Kingsville, Texas - The Navy released today a memorandum of agreement (MOA), signed by officials from the Department of Defense (DoD), the Department of the Navy and Texas Wind Group (TWG), which outlines a mutual approach to enable a renewable energy developer to build and operate wind turbines at planned locations in Kleberg County, Texas, while reducing the potential for those turbines to affect flight operations at NAS Kingsville.

"Sustaining military readiness is the number one priority of everyone in the Navy chain of command," said Capt. Mark McLaughlin, commanding officer of NAS Kingsville. "This agreement helps preserve NAS Kingsville's capability to train naval aviators, while enabling the compatible development of new energy sources."

Signing for DoD was David Belote, director of the DoD Energy Siting Clearinghouse. Signing for the Navy were Roger Natsuhara, principal deputy assistant secretary of the Navy for Energy, Installations and Environment; John Quinn, acting director of the Chief of Naval Operations Energy and Environmental Readiness Division; Vice Adm. William French, commander, Navy Installations Command; Rear Adm. John Scorby, commander, Navy Region Southeast; Capt. Douglas Edgecomb, commanding officer, Naval Air Station Corpus Christi, and McLaughlin. Dru Steubing signed on behalf of Texas Wind Group Managing.

"The Navy recognizes the strategic and fiscal importance of developing domestic sources of energy for use both ashore and at sea," said Quinn. "As we develop new sources of energy, it is critical that we not create a new problem as we solve another. This agreement with the Texas Wind Group is proof that, when energy developers and the military work together, it is possible to achieve a win-win for both national security and energy security. This agreement allows the military mission and alternative energy production to co-exist in South Texas, and may pave the way for similar agreements elsewhere."

TWG's Riviera I wind farm project will be comprised of 83 turbines between nine and 11.5 nautical miles south of NAS Kingsville's radars and navigation aids. Electromagnetic interference (EMI) from the turbines has the potential to impact those systems. However, the MOA describes technical solutions for this, such as connecting NAS Kingsville's air surveillance radar system with the radar at Corpus Christi International Airport and optimizing radars to "ignore" signals received from wind turbines. TWG will contribute $500,000 to help pay for these technical upgrades to Navy radar systems. Under the MOA, TWG also agreed to reposition certain turbines which would have caused interference with the Kingsville precision approach radar. TWG also agreed to temporarily curtail the operation of certain turbines if the precision approach radar is negatively affected.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Austal Delivers LCS 8 to US Navy

Austal Limited (Austal) (ASX:ASB) delivered the future USS Montgomery (LCS 8) to the U.S. Navy, during a ceremony held aboard the ship at Austal USA’s shipyard in Mobile, Alabama, USA on 23 June.

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

US Navy Accepts Delivery of Future USS Montgomery

The U.S. Navy has accepted delivery of future USS Montgomery (LCS 8) during a ceremony on June 23 at the Austal USA shipyard in Mobile, Ala.   Marking the official

News

HCI Capital Renamed Ernst Russ AG

A vote was passed at the ordinary shareholders’ meeting of HCI Capital AG yesterday to change the company’s name to Ernst Russ AG. The Executive Board and Supervisory

ABP orders Two Gottwald cranes

Terex Port Solutions (TPS) has received an order from Associated British Ports (ABP) for two electric Terex Gottwald Model 8 portal harbour cranes in the G HSK 8424 B four-rope grab variant.

Traffic Separation Schemes off Western Australia

On 1 December 2016 two new Traffic Separation Schemes (TSS) will come into effect off the south-west coast of Western Australia. Australia’s proposal to establish

Wind Power

Ulstein Delivers for BS Offshore

The first of two service operation vessels (SOV) ordered in 2015 by Bernhard Schulte Offshore (BS Offshore) and its client Siemens from Ulstein Verft in is now completed,

Maritime Projects Continue Shaping Rhode Island’s Future

When I visit Rhode Island, one of the first things I notice its extensive water resources available for tourism, sports and commerce not to mention the ability

Severe Weather Forecast for Port Kembla, Australia

The Harbour Master at Port Kembla has issued a notification of potential severe weather forecast for the next 72 hours (18-21 June). The port remains open and conditions will be monitored closely.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0903 sec (11 req/sec)