Abu Dhabi MAR Kiel

(Press Release)
Thursday, September 01, 2011

As of September 1, 2011, the contracts for the acquisition of the former HDW Gaarden GmbH in Kiel have entered into force. Abu Dhabi MAR Kiel GmbH starts with 172 employees, the facilities, equipment and infrastructure of the former HDW Gaarden, working on first orders of its target markets offshore, mega yachts and construction of special vessels. Management Directors of this new company are Ms Susanne Wiegand and Mr Holger Kahl. The operations manager is Mr Christian Schmitt, who already held a leading position at HDW Gaarden’s surface vessel division for several years. Abu Dhabi MAR Kiel is currently building a 75 m yacht and an offshore transformer platform. Start of construction of a second offshore transformer platform, for which an order has already been placed, will be in due course. Further projects in the company’s main fields of activity are currently in good progress. These projects will guarantee full capacity utilisation in the future. In order to ensure a long-term and optimal utilisation of the facility in Kiel and a competitive cost structure, a close cooperation with Nobiskrug GmbH in Rendsburg providing major services has been established. Abu Dhabi MAR Kiel and Nobiskrug are members of an international group of shipyards with operational sites in Germany, England, France, Greece and Abu Dhabi.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

US Navy Tests Latest Aegis Weapon System

The U.S. Navy conducted a series of cooperative air defense test exercises with the Spanish navy that culminated in live missile firing events using the latest Aegis Weapon System baseline July 20-21.

Antwerp Port CEO Scoops Baron Title

After 25 years as CEO of Antwerp Port Authority, Eddy Bruyninckx has been raised to the nobility by H.M. the king of Belgium with the rank of baron. In Belgium

SENER Presents Two FORAN Papers at the Morintekh

In June, the SENER engineering and technology group participated in the 17th Morintekh – Praktik 2016 Scientific Conference, in the city of St. Petersburg, Russia.

Shipbuilding

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0939 sec (11 req/sec)