Diesel-Electric Units Prepared for Navy’s AGOR Project

MarineLink.com
Wednesday, May 08, 2013

During most of 2012, Cummins Northwest was busy with the procurement of the various subsystems and assembly of the diesel-electric units for the two Ocean Class Auxiliary General Purpose Oceanographic Research (AGOR) vessels building at Dakota Creek Shipyards They delivered the first four-unit ship set in January of this year.

Seattle-based Guido Perla & Associates, Inc. did the design work for the two vessels. Four Cummins QSK38-DM powered electrical generators will provide power for each of these 238 by 50-foot vessels. The generators will provide power to each vessel’s two AC propulsion motors that each turn controllable pitch propellers. Cummins Northwest Inc. has worked with Siemens Industries to develop the generator sets.

The four gensets on each vessel will also provide power to an azimuthing bow thruster and a tunnel stern thruster as well as general electrical requirements of the vessel. As on the University of Delaware’s 2005-built RV Hugh R. Sharpe, also built by Dakota Creek, the four engines allow for sound reduction when running at slow speeds on only one or two engines as required.

Being built for the U.S. Navy’s Office of Naval Research (ONR), the two vessels, designated AGOR 27 and AGOR 28, are expected to deliver in late 2014 and early 2015. The Woods Hole Oceanographic Institution will manage AGOR 27, while the Scripps Institution of Oceanography will manage AGOR 28 under charter party agreements with ONR.

Information released by the ONR explains that: “Both ships will have the ability to sail at a sustained speed of 12 knots and will have 20 berths allotted for crew members and 24 for scientists. Some of the high-tech features planned include: acoustic navigation and tracking systems that operate at various depths; a specially designed hull that diverts bubbles from the acoustic sensor area; a centralized freshwater cooling system to provide heating, ventilation and air conditioning; and dual-controllable propellers with variable speed motors for increased efficiency.”

Secretary of the Navy Ray Mabus has announced that, when commissioned, the AGOR 27 will be officially named R/V Neil Armstrong. “Naming this class of ships and this vessel after Neil Armstrong honors the memory of an extraordinary individual, but more importantly, it reminds us all to embrace the challenges of exploration and to never stop discovering,” Mabus said.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

GTT Records Order for 2 LNG Tankers

GTT receives a new order from Hyundai Samho Heavy Industries for two LNGCs for Teekay   GTT, a designer of membrane containment systems for the maritime transportation

MES Delivers Bulk Carrier Newbuild

MES delivers next ship of its Eco-Ship neo60BC design, 60,000 DWT type bulk carrierM.V. Phoenix Rising   Mitsui Engineering & Shipbuilding Co., Ltd. (MES) completed and delivered a 60,

NAPA Streamlines Compliance with Class Design Rules

NAPA Steel and NAPA Designer updated to reduce man-hours and duplication associated with new Common Structural Rules BC&OT   Global maritime software, services

Navy

European Court Ups Standards for River Dredging

The European Court of Justice (ECJ) ruled on Wednesday that damage to water quality must be considered when authorities approve river dredging to expand ports,

UK Navy’s Ice Patrol Ship Gets a New Coating

U.K. Royal Navy Ice Patrol Ship HMS Protector is deployed on operations for 330 days a year, mostly in the Antarctic region, making it essential that her underwater

Crowley Takes Over Management of MSC Ships

Crowley strengthens relationship with U.S. Navy, completes turnover of Military Sealift Command T-AGOS/T-AGM fleet   Crowley Maritime Corp. announced its global

Marine Power

MES Delivers Bulk Carrier Newbuild

MES delivers next ship of its Eco-Ship neo60BC design, 60,000 DWT type bulk carrierM.V. Phoenix Rising   Mitsui Engineering & Shipbuilding Co., Ltd. (MES) completed and delivered a 60,

Gondan Delivers Patrol Boats Rio Belelle, Rio Agueda

Gondan GRP Division has handed over two 36 knots maximum speed patrol boats. Yesterday the GRP Patrol Boats built for the Maritime Service of the Spanish Guardia

First ME-LGI Engine Test Deemed a Success

Mitsui tests first commercial model on HFO and methanol   MAN Diesel & Turbo licensee Mitsui Engineering & Shipbuilding Co., Ltd. (MES) recently demonstrated

Vessels

GTT Records Order for 2 LNG Tankers

GTT receives a new order from Hyundai Samho Heavy Industries for two LNGCs for Teekay   GTT, a designer of membrane containment systems for the maritime transportation

MES Delivers Bulk Carrier Newbuild

MES delivers next ship of its Eco-Ship neo60BC design, 60,000 DWT type bulk carrierM.V. Phoenix Rising   Mitsui Engineering & Shipbuilding Co., Ltd. (MES) completed and delivered a 60,

Gondan Delivers Patrol Boats Rio Belelle, Rio Agueda

Gondan GRP Division has handed over two 36 knots maximum speed patrol boats. Yesterday the GRP Patrol Boats built for the Maritime Service of the Spanish Guardia

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3173 sec (3 req/sec)