New Giant LNG Carrier Will Look Different

Press Release
Tuesday, December 11, 2012
Sayaendo LNG Carrier: Image credit MHI

Mitsubishi Heavy Industries commences "Sayaendo", a distinctive-looking LNG carrier at Nagasaki Shipyard & Machinery Works.

The Sayaendo Series has a hull shape that evolved from LNG carriers with Moss-type hemispherical tanks, (and it offers significant improvements in fuel consumption and maintainability. The unit now being built is slated for delivery in the fiscal year 2014 (ending March 31, 2015).

To protect its four Moss spherical tanks, the Sayaendo (Japanese for 'pea-pod') features a peapod-shaped continuous cover integrated with the ship's hull in lieu of a conventional hemispherical cover. This innovative configuration enables reductions in size and weight while maintaining the ship's overall structural rigidity. The continuous cover over the tanks also improves aerodynamics by substantially reducing wind pressure, which serves as drag on ship propulsion.

The LNG carrier will measure 288.0m (meters) in length overall (LOA), 48.94m in width, and 11.55m in draft. The 138,000 gross tonnage (75,000 deadweight tonnage) ship is capable of carrying up to 153,000m3 of LNG (cargo tank total volume: 155,000m3). It will be jointly owned by Osaka Gas International Transport Inc. (OGIT), a wholly owned subsidiary of Osaka Gas handling the operation of LNG carriers, and MOL, which will function as the ship management company.


For its main power plant the Sayaendo adopts MHI's "Ultra Steam Turbine Plant" (UST), a new turbine that provides higher thermal efficiency through effective use of thermal energy by reheating steam. Through downsizing, weight reduction and hull line improvement, the new ship achieves a substantial 25% reduction in fuel consumption per unit cargo compared to conventional ships.



With a conventional cover configuration, pipes, wires and catwalks atop the tanks are supported by complex structures. By covering the tanks with an integrated cover and making those supporting structures unnecessary, the new design also improves maintainability.

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Samsung Heavy Venturing Overseas

SHI is ready to invest around $950 million in the overseas shipbuilding facility by 2017, according to SHI’s Chief Financial Officer Chun Tae Heung. Tankers, bulk

Ingalls Shipbuilding Begins Fabrication for Aegis Destroyer

Huntington Ingalls Industries' (NYSE:HII) Ingalls Shipbuilding division today marked the start of fabrication for the future Aegis-guided missile destroyer Paul Ignatius (DDG 117).

Industry Professionals to Speak at ShipConstructor Conference

The speakers representing various companies at next week's SSI Americas ShipConstructor User Conference, October 7-9, 2014 in Mobile, Alabama, demonstrate SSI's

LNG

Louisiana to Get Natural Gas Liquefaction and Fueling Facility

Tenaska Bayou LNG expected to meet growing marine, transportation and oil and gas exploration and production demand on the Gulf Coast Tenaska NG Fuels, LLC and Waller Marine, Inc.

GTT Earns Five AIPs for Multi-gas Membranes

Gaztransport & Technigaz (GTT), designer of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announced five

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2502 sec (4 req/sec)