Statoil Reports Dramatic Increase in Net Income

Thursday, July 28, 2011

Statoil's second quarter 2011 net operating income was NOK 61 billion, a 129% increase compared to NOK 26.6 billion (nearly $11.3 billion) in the second quarter of 2010. The quarterly result was mainly affected by a 32% increase in the average prices for liquids measured in NOK, a 28% increase in average gas prices, a NOK 8.8 billion (over $1.6 billion) gain related to the 40% Peregrino divestment and an 18% decrease in lifted volumes, when compared to the same period last year.

"Statoil delivered record net income in the second quarter of 2011, reflecting an operational performance in line with expectations, the value-creating Peregrino transaction and strong oil and gas prices throughout the period. Production was mainly impacted by previously announced extensive maintenance activities and seasonal variability in gas off-take. We continued to make progress within exploration and project developments in the quarter, staying on track to deliver future growth," says Helge Lund, Statoil's chief executive officer.

Net income in the second quarter of 2011 was NOK 27.1 billion (over $5 billion) compared to NOK 3.1 billion (over $572.2 million) in the same period last year. This result reflected higher prices for both liquids and gas, a gain on sale of asset of NOK 7.5 billion (almost $1.4 billion) net of tax, reduced exploration expenses and higher net financial income, partly offset by reduced liftings. The tax rate for the quarter was 56%.

Adjusted earnings in the second quarter of 2011 were NOK 43.6 billion (more than $8 billion), compared to NOK 36.5 billion (over $6.7 billion) in the second quarter of 2010. Adjusted earnings after tax were NOK 12.8 billion (almost $2.4 billion) in the second quarter of 2011. Adjusted earnings after tax exclude the effect of tax on net financial items, and represent an effective adjusted tax rate of 71% in the second quarter of 2011.

Total equity production was 1,692 mboe per day in the second quarter of 2011 compared to 1,957 mboe per day in the second quarter of 2010.

Highlights since first quarter 2011:
 
    * The sale of 40% of the Peregrino offshore field in Brazil was completed and a gain of NOK 8.8 billion before tax is recorded.
    * Successful exploration drilling activities in Norway and internationally.
    * The approval of the Plan for development and operation (PDO) for the Hyme field (formerly Gygrid) on the NCS.
    * The approval of the Plan for development and operation of the Valemon gas and condensate field on the NCS.
    * The approval of the Plan for development and operation of the Valemon gas and condensate field on the NCS.
    * The approval of the Plan for development and operation for Visund South fast track on the NCS.
    * Statoil awarded the contract for construction of two new specially designed category D drilling rigs.
    * First shipment of Peregrino crude.
    * Strengthened position in Eagle Ford through acquiring new leases.

 

(Source: Statoil Press Release)

Email AddThis Feed Button
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Liebherr Delivers Heavy Lift Offshore Crane For “Vidar”

In June, components weighing up to 420 tonnes each for Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic  were loaded from Liebherr MCCtec Rostock

BMT Acquires Verweij & Hoebee

To strengthen BMT’s market position in blue water surveys, BMT Group Ltd, acquired marine survey and consulting engineers, Verweij & Hoebee.     A co-founder

Crowley's 'Alert' Tugboat Commended for Alaska Rescue Tow

Representative Eric Feige from the Alaska State Legislature presents a letter of commendation to the 'Alert's crew for their rescue tow of drill barge 'Kulluk'.

Offshore

Offshore Wind Spend to Average $21B per year

Douglas-Westwood (DW) forecast offshore wind installations averaging 3.2 GW per year over the next ten years with capital expenditure hitting a peak of $24.1B in 2016.

Liebherr Delivers Heavy Lift Offshore Crane For “Vidar”

In June, components weighing up to 420 tonnes each for Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic  were loaded from Liebherr MCCtec Rostock

TGS Starts Barents Sea 3D Seismic Survey

The 3D EM data is being acquired by the M/V 'Atlantic Guardian': data will be available to clients through both EMGS and TGS. The survey is supported by industry funding.

Finance

Offshore Wind Spend to Average $21B per year

Douglas-Westwood (DW) forecast offshore wind installations averaging 3.2 GW per year over the next ten years with capital expenditure hitting a peak of $24.1B in 2016.

Breaking Down The Cost of MARPOL

Since January 8, 2009, United States (U.S.) and foreign flagged ships operating in the waters of the U.S. have been subject to MARPOL Annex VI. The Marine Environmental

Economic Impacts of STCW 2010

Our global economy and the maritime community have been greatly impacted by the implementation of the International Convention on Standards and Training, Certification

Energy

Chinese Coal Imports Remain in the Foreground

There was marginal improvement in the dry bulk market as improvement in demand for larger vessel segments was countered by a decline in demand for the smaller ones.

Offshore Wind Spend to Average $21B per year

Douglas-Westwood (DW) forecast offshore wind installations averaging 3.2 GW per year over the next ten years with capital expenditure hitting a peak of $24.1B in 2016.

All-Solar Vessel: "Ambassador for Clean Energy"

The world’s largest all-solar ship has been circumnavigating the globe since 2010. In May 2012, the vessel completed a 584-day, 37,000-mile global journey through

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright