UK Dredger Fishes Up WWll Mine

Press Release
Thursday, November 29, 2012
Mine Caught in Dredger Head: Photo credit MOD

A 1,500lbs (680kg)  high explosive WWll  mine was brought to the surface by a dredger six miles north of Sheerness.

Before carrying out a controlled explosion a four-man Navy team from Southern Diving Unit 2 in Portsmouth had to carefully remove the device from the vessel's dredge head.

Chief Petty Officer Ian 'Scouse' Fleming, who led the team, worked for seven hours through the night in atrocious conditions to safely extract the mine and hoist it onto the dredger's upper deck. He said: "I had to crawl along a pipe to reach the mine to attach chains. It was a confined space and waves were splashing all around me. The fuses had been bashed about a bit and were quite dangerous and the explosives were exposed.

The Second World War device - which measured two metres long by 50cm in diameter - was towed two miles (3km) further out to sea and dropped to a depth of about ten metres. The controlled explosion caused a 76-metre-high plume, which was clearly visible from the shore.






 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Messer's CEO Norville Announces Retirement

Bill Heller to assume the position as Messer Cuttings Systems’ President and CEO Gary Norville started at Messer Cuttings Systems Inc. in September 1980 selling and installing cutting machines.

Rohr Dredge Continues European Expansion

Rohr International Dredge Holdings, Inc. announced that it acquired Eurl Rohr France, including its current backlog, inventory and all associated intellectual property (IPR), on July 23, 2014.

Dredging

LUSCHI Begins Dredging at ArcelorMittal’s Canal

LUSCHI announced today it will mobilize its vessel Giovanella to Espírito Santo to assist in the dredging and final disposal of accumulated sediments in the seawater storage canal of ArcelorMittal,

Rohr Dredge Continues European Expansion

Rohr International Dredge Holdings, Inc. announced that it acquired Eurl Rohr France, including its current backlog, inventory and all associated intellectual property (IPR), on July 23, 2014.

Dredging at Jurong Port, Singapore

Dredging work will be carried out at Keppel Shipyard Benoi Road, off West Jurong Channel, from 28 July to 30 September. As per the Maritime and Port Authority of Singapore Port Marine Notice No.

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1988 sec (5 req/sec)