Maersk Drilling Fast Out of the Blocks in 2013

Press Release
Tuesday, May 21, 2013

Interim financial results for Q1 2013 show a strong start to 2013 by Maersk Drilling.

With an increase in profit to USD 146 million in the first quarter of 2013 from USD 123 million in first quarter of 2012, Maersk Drilling has come off to a good start in 2013. The strong result – up by 19 % –  is positively impacted by a solid operational performance across the entire rig fleet.

“The performance in the first quarter of 2013 shows the strength and potential of our business. With a strong financial performance driven by solid operations we are back on track, and we reiterate our expectation of a higher result in 2013 compared to 2012. Our long term target remains intact with an ambition of delivering a profit of USD 1 billion by 2018,” says Claus V. Hemmingsen, CEO of Maersk Drilling and member of the Executive Board of the A.P. Moller - Maersk Group.

By the end of the first quarter of 2013, Maersk Drilling’s forward contract coverage was 98 % for the remaining part of 2013. For 2014 the forward contract coverage is 79 %, 51 % for 2015, and 41 % for 2016.

Maersk Drilling currently has seven rigs under construction, including three ultra-harsh jack-up rigs and four ultra deepwater drill ships corresponding to a committed investment of USD 4.5 billion.

Of the seven newbuild rigs, contracts have already been secured for five rigs totalling a contract backlog of 17 rig years and an estimated revenue backlog of around USD 2.9 bn.

"We are in discussions with customers regarding the last two drillships and we are confident about the employment prospects for these two units. Customers continue to show a clear preference for modern equipment with enhanced safety and operational capabilities," says Claus V. Hemmingsen.
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Finance

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Oil Deal Between Iraqi Kurdistan & Baghdad Welcomed

The United States welcomes an agreement between Iraq's central government in Baghdad and its northern Kurdistan region over the management of oil exports, U.

Nigeria to Cut Petrol Subsidy by Half

Nigeria plans to cut subsidies on petroleum products by half next year after sharp falls in global crude prices, spurred the government to revise its 2015 budget downwards,

Offshore Energy

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Update: Explosion in the Gulf of Mexico

An explosion occurred aboard a production platform Thursday at West Delta 105, operated by Fieldwood Energy, resulting in one fatality and three injured. The Bureau

Deepwater Semi-Sub COSL Prospector Delivered

COSLProspector, the fourth deep-water semi-submersible drilling rig built by CIMC Raffles for China Oilfield Services Limited (COSL), has been delivered in Yantai, Shandong Province.

Underwater Engineering

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

EMGS to Map Brazil's Gas Hydrates

Electromagnetic Geoservices ASA (EMGS) has received a contract worth USD 1.5 million for a research project in Brazil. The project will use 3D EM data to map

Rosneft Completes Geological Survey

Rosneft reports on 100% completion of the geological survey program on Company's offshore license areas for 2014. In the current year geological survey covered

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1583 sec (6 req/sec)