Hyundai Heavy Wins $750 Million Drilling Rig Order

MarineLink.com
Thursday, May 30, 2013
Photo: Hyundai Heavy Industries

Hyundai Heavy Industries (HHI) announced that it won a $750 million order to build a semisubmersible drilling rig for Diamond Offshore.

The drilling rig, measuring 123 meters in length and 96 meters in width, can operate in waters 3,000 meters deep with a drilling range of 12.2 kilometers from the sea’s surface. The rig is scheduled to be delivered by November 2015.

english.hhi.co.kr
 

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

Algoma Central Orders New Great Lakes Ships

Algoma Central Corporation announces $160 million investment in fleet expansion and fleet renewal   Algoma Central Corporation announced that it has acquired

Russia, France Close to Deal on Mistrals

Russia and France are close to reaching an agreement for Paris to cancel a frozen contract on the sale of Mistral helicopter carriers and reimburse Moscow, a Russian

Energy

Goliat FPSO in Norway

The Goliat FPSO was successfully floated off the heavy-lift vessel, Dockwise Vanguard, in the fjord outside Hammerfest, says Eni Norge    The Goliat platform has arrived in Hammerfest,

Skangass Celebrates Topping Up

Nordic liquefied natural gas operator Skangass  has celebrated a topping out ceremony at its Pori LNG terminal. The company said it was making progress in the

Falklands' Oil Drilling at Isobel Deep Suspended

Oil explorers drilling in the waters north of the Falkland Islands have suspended work on the second well of their 2015 current six-well drilling campaign after a technical problem.

Offshore Energy

Falklands' Oil Drilling at Isobel Deep Suspended

Oil explorers drilling in the waters north of the Falkland Islands have suspended work on the second well of their 2015 current six-well drilling campaign after a technical problem.

Four Petrobras Platforms Halt Output Due to Oil Leak

Four Petrobras oil platforms off the northeast coast of Brazil have halted production after a leak of about 7,000 liters of oil was detected coming from a pipeline linking them,

Huat Retires as Non-Ex Dir. of ST Engineering

Singapore Technologies Engineering Ltd (ST Engineering) today announced the retirement of Mr Quek Poh Huat as non-executive Director of the Company at its Annual General Meeting on 23 April 2015.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1727 sec (6 req/sec)