Drilling Rig Status Update from Rowan

Press Release
Sunday, December 23, 2012

Rowan Companies plc gives an update on notable events.

  • EXL I:  Changed day rate to mid $220s (previously mid $210s) due to amortization adjustment.
  • J.P. Bussell:  Rig is expected to be off rate for five days in 1Q 2013.
  • Scooter Yeargain:  Rig is expected to enter the shipyard in January 2013 (previously March 2013) for 105 days (previously 135 days) for customer-required equipment upgrades.
  • Gorilla VI:  Off rate time in 4Q 2012 was eight days instead of the previously expected 25 days.
  • Cecil Provine:  Off rate time in 4Q 2012 was 49 days instead of the previously expected 57 days.
  • Rowan Norway:  Rig is currently in the shipyard for contract requirements and is expected to commence operations early January 2013 (previously mid December 2012).  Rig is expected to be in the shipyard for approximately 80 days (previously 60 days) in 4Q 2012, part of which may be compensated.  If necessary, the day rate will be adjusted to reflect compensated shipyard days in a subsequent fleet status.  Changed day rate to the mid $350s (previously mid $360s) due to downward revision in expected reimbursement for modifications.
  • Rowan Stavanger: Off rate time in 4Q 2012 was 25 days instead of the previously expected 16 days.  Following completion of the well for Talisman in Norway in March 2013, the rig will operate in the U.K. sector of the North Sea at a day rate in the mid $240s through November 2013.  While the rig is working in the U.K. sector of the Rowan Viking:  Rig will enter the shipyard in February 2014 for equipment modifications and inspections for approximately 105 days (previously 30 days) prior to commencing its contract with Lundin for 15 wells in the Norwegian sector of the North Sea estimated to start in 2Q 2014.

The Company states it will not realize any day rate revenue during periods of off rate time, and crew costs will be capitalized during rig modifications and/or upgrades.

 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

HII Secures Aircraft Carrier Planning Contract

Huntington Ingalls Industries (HII) was awarded a $152 million contract for advance planning for the construction of the third aircraft carrier in the Gerald R.

Wood Group Bags Statoil MSA

Wood Group has been awarded an evergreen master services agreement (MSA) by Statoil to support the life cycles of its offshore  and onshore facilities. Work and

Russian Shipbuilder Wins $1 bln Iran Oil Rig Deal

Russian shipbuilder Krasnye Barrikady has been awarded a near-$1 billion contract by Iran to build five offshore drilling rigs for use on Iran's part of the Gulf shelf,

Offshore

Subsea 7 Awarded $1bn Wind Farm Offshore UK Deal

Subsea 7 S.A. informed today the details of the major(1) contract award that was first announced on 20 May 2016 . The contract was awarded by Beatrice Offshore Windfarm Limited (BOWL)(2),

BW LPG Registers 10% Growth in VLGC Fleet

Less domestic petrochemical consumption of LPG would be positive for VLGC shipping as it would result in a greater surplus of LPG available for export.    However,

Subsea 7 Secures EPCI Contract

Subsea 7 S.A. announced it has been awarded an engineering, procurement, construction and installation (EPCI) contract for offshore execution in 2017 and 2018.   The

Offshore Energy

Maritime Consolidation: Palfinger Aims to Acquire Harding

As maritime markets continue to struggle, merger and acquisition activity should heat up. Today, Austria's Palfinger Group announced that it intends to acquire

Subsea 7 Awarded $1bn Wind Farm Offshore UK Deal

Subsea 7 S.A. informed today the details of the major(1) contract award that was first announced on 20 May 2016 . The contract was awarded by Beatrice Offshore Windfarm Limited (BOWL)(2),

Russian Shipbuilder Wins $1 bln Iran Oil Rig Deal

Russian shipbuilder Krasnye Barrikady has been awarded a near-$1 billion contract by Iran to build five offshore drilling rigs for use on Iran's part of the Gulf shelf,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0843 sec (12 req/sec)