Drydocks World Cut First Steel for Shell's FLNG Module

Press Release
Monday, June 04, 2012
Photo credit Drydocks World

Dubai's Drydocks World announce steel cutting for the first 'Turret' module of Shell's pioneering Floating Liquefied Natural Gas facility

Drydocks World has announced that Shell’s pioneering Prelude Floating Liquefied Natural Gas (FLNG) facility – the world’s first – was initiated with a Steel Cutting ceremony of its Turret, the world’s largest – at more than 90 m in height and 30 m in diameter and weighing 11,500 tonnes. The Ceremony was attended by senior personnel from Shell, Technip, SHI and SBM Offshore.

The Turret will be built as six modules at the Dubai shipyard and shipped to Samsung Heavy Industry's yard in Korea, where these will be integrated into the FLNG facility, once it is built. Drydocks World had earlier been awarded the Turret building contract by SBM Offshore as part of its contract with Technip for the engineering, procurement and construction (EPC) of the FLNG Turret Mooring System.

Once constructed the FLNG facility will be towed to location where it will be permanently moored in 250m-deep water through the turret, providing weathervaning capabilities, and a 4x4 mooring system. The FLNG facility and its mooring system have been designed to withstand extreme weather conditions including a Category 5 cyclone.

“The shipyard has extensive experience in managing projects of great significance to the world oil and gas industry. It is indeed a matter of great pride to be associated with this historic project, the scope and scale of which is massive and has the capability of defining future developments in the offshore gas industry" said Khamis Juma Buamim, Chairman of Drydocks World and Maritime World.


 
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Newport News, ODU Partner for Bachelor's Degree Program

Huntington Ingalls Industries (HII) announced today that apprentices at Newport News Shipbuilding will now have the opportunity to earn a bachelor of science degree

Azeri Shipyard, BP Sign Vessel Construction Contract

Azeri state energy company SOCAR's shipyard and British oil major BP have signed a $378 million deal to design and build a subsea construction vessel for the Shah Deniz II gas project,

Fishing Vessels Fit with Wärtsilä’s NOx Reducer

Wärtsilä said its new NOx Reducer will be fitted to two new fishing vessels under construction at the Celiktrans yard in Turkey. The ships are owned by HB Grandi,

Offshore

GulfMark Offshore Records Highest Ever Q1 Revenue

Houston-based GulfMark Offshore President & CEO Quintin Kneen commented on his company's first quarter 2014 financial report: "We recorded our highest first quarter revenue ever,

Offshore Oil & Gas: Brazil’s Northern Frontier

In an effort to spread out oil and gas production to other parts of the country and increase overall oil production, Brazil has finally intensified hydrocarbon

Safety the Focus as Heavy Lifting Picks Up

Modern heavy lift capabilities are crucial for safe, efficient operations offshore Heavy lift operations offshore are an awe-inspiring feat, but an operation that

Energy

Baker Hughes Announces Q2 Conference Call

Baker Hughes Incorporated (NYSE: BHI) announced today that it has scheduled a conference call on Thursday, July 17, 2014, to discuss results for the second quarter 2014, ending June 30, 2014.

Explosion Rocks Natural Gas Processing Plant In Wyoming

An explosion on Wednesday rocked a natural gas-processing plant in Wyoming that can churn out about 2 percent of the daily U.S. gas supply, though no injuries were reported.

Euronav Posts 62% Core Profit Increase

Belgian crude oil shipping group Euronav on Wednesday unveiled a 62 percent rise in first-quarter core profit as daily rates for its fleet rebounded from last year.

LNG

ABS Approves Design for GTTNA’s LNG Bunker Barge

GTT North America (GTTNA), the Houston-based subsidiary of French engineering and technology company Gaztransport & Technigaz SA (GTT), received approval in principle from ABS for the design of a 2,

ISS to Support Petrobras Expansion

Inchcape Shipping Services (ISS)  has had its port agency and tanker husbandry services contract significantly enlarged by Petrobras.   The Brazilian government-owned energy giant,

Keystone Backers Keep Their Faith In Embattled Pipeline Plan

Six years after applying to build the Keystone XL pipeline, Canada's frustrated oil industry appears steadfast in its support of the plan even though Washington

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1176 sec (9 req/sec)