Study Helps Advance Hybrid Electric SWATH Design

Posted by Eric Haun
Tuesday, December 10, 2013
CTruk's first SWATH OWSV built in 2013 (CWind Astute)

A feasibility study around a hybrid powertrain SWATH, commissioned this year by CTruk, has given the company further impetus in its ongoing development of a hybrid electric offshore wind support vessel design.

The study was based on the CTruk CWhisper SWATH, a 20m craft fitted with twin Cummins QSM-11 marine diesel engines and Rolls-Royce Kamewa FF41 waterjets. The feasibility report concluded that the implementation of a parallel hybrid solution would result in substantial operational cost savings on this particular vessel, an attractive prospect coupled with the already well-documented advantages of the SWATH hull form in offshore wind operations.

Marine craft in the offshore wind support sector typically have two major transit periods each day, with the rest of their time at sea spent idling or slow maneuvering with the occasional high speed peak. This usage profile makes OWSVs ideally suited to a hybrid configuration. The introduction of an electric motor to handle the load during low power demand periods allows the boat’s engines to be turned off or run as generators at a more optimized power rating. As well as the obvious fuel savings incurred, this reduces hours and wear on the engines, a key point for commercial marine vessels which typically require engine services every few weeks. The life expectancy of an engine could be increased dramatically if the craft ran electric during idling downtime, as these craft can idle for up to 50% of a shift offshore. Resulting reduced maintenance and direct costs also represent significant savings.

CTruk builds high-speed vessels using resin-infused FRP composite, a robust material that is around 40% lighter than aluminum. These vessels are therefore well able to take the extra weight of the additional drive train needed for hybrid operation, a small price to pay for the resulting greatly reduced running costs possible over the vessel’s lifetime. The unique belt drive transmission system currently being fitted on CTruk’s latest SWATH build will be included on all subsequent CTruk SWATH vessels, future-proofing these craft by allowing for the retrofitting of a parallel hybrid solution.

Jim Cutts, director of engineering at CTruk commented, “CTruk has always strived to offer more cost-efficient workboats and the reduced fuel consumption of our lighter, composite vessels has been a key factor in achieving this aim. We envisage that the significant further reduction of fuel usage on a hybrid electric vessel will see CTruk’s product range thrust forward into the future of offshore wind construction and O&M, a future where efficiency and cost reduction reign.”

ctruk.com
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

‘Green’ Hybrid-powered Research Vessel Christened

The Maritime Aquarium at Norwalk christened a larger, “greener” new research vessel on Friday, September 26 in preparation for launching a new era in examining,

Power and Endurance Ready for Austrailian Waters

Wamalhanha is the final newbuild in a series of six tugs of the Robert Allan Design, RAstar 3200 where her main duties will be terminal activities, escort duties, ship assist, towage duties.

MAN Propulsion Packages for New Icelandic Trawlers

MAN Diesel and Turbo inform that Icelandic owners, HB Grandi, Vinnslustodin hf. and Hradfrystihusid Gunnvör, have ordered newbuildings based on two different ship

Marine Power

Cummins Debuts Mobile Tier 4 Generators

Cummins’ certified Tier 4 Final QSB7 and QSL9 engine platforms form the basis for mobile sets that meet EPA regulations U.S. EPA Tier 4 Final certified mobile

‘Green’ Hybrid-powered Research Vessel Christened

The Maritime Aquarium at Norwalk christened a larger, “greener” new research vessel on Friday, September 26 in preparation for launching a new era in examining,

Power and Endurance Ready for Austrailian Waters

Wamalhanha is the final newbuild in a series of six tugs of the Robert Allan Design, RAstar 3200 where her main duties will be terminal activities, escort duties, ship assist, towage duties.

News

NY Harbor Supply & Distribution Fall Reception/Buffet

More than 600 attendees are expected at the 52nd annual New York Harbor Supply & Distribution Fall Reception/Buffet for the energy and energy related industries

Kounalakis Joins OW Bunker N. America

OW Bunker, a reseller and physical supplier of marine fuels, announced the appointment of Georgia Kounalakis to its physical supply operation in North America.

Louisiana to Get Natural Gas Liquefaction and Fueling Facility

Tenaska Bayou LNG expected to meet growing marine, transportation and oil and gas exploration and production demand on the Gulf Coast Tenaska NG Fuels, LLC and Waller Marine, Inc.

Vessels

Nigerian Customer Orders Ninth Damen Dredger

A Nigerian customer has added its ninth Damen dredger to its fleet. The Cutter Suction Dredger type CSD500 was chosen due to the availability of Damen Field Services in Nigeria,

Power and Endurance Ready for Austrailian Waters

Wamalhanha is the final newbuild in a series of six tugs of the Robert Allan Design, RAstar 3200 where her main duties will be terminal activities, escort duties, ship assist, towage duties.

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1755 sec (6 req/sec)