GPA Appoints Payne as Electrical Dept. Manager

press release
Wednesday, December 14, 2011
Joseph E. Payne

Joseph E. Payne, P.E. has joined Seattle-based Naval Architecture and Marine Engineering firm Guido Perla & Associates, Inc. (GPA) as the Electrical Department Manager and Chief Electrical Engineer.

 

At GPA, Mr. Payne is responsible for the complete design and systems integration of all main and emergency power, lighting, HVAC controls, hazardous area classification, interior communications & alarm systems.  This includes engineering oversight, detailed design work, specification development and resolution of regulatory body issues. 


With over 25 years of electrical system design and project management experience, Mr. Payne holds an Electrical Engineering degree (B.S.) from the University of Missouri.  A former U.S. Navy nuclear submarine officer, Captain Payne is a Naval War College graduate and a retired Engineering Duty Officer.

 

He gained his extensive commercial ship design experience working for various shipyard and naval architecture firms as Senior Electrical Engineer, Project Manager/Engineer and educator/mentor. In addition to being a registered Professional Engineer (Electrical) in Washington and Louisiana, Mr. Payne is a LEED (Leadership in Energy & Environmental Design) Accredited Professional, with specialized training in incorporating environmentally-friendly features in the project design. www.gpai.com
 

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Madsen to Chair Norway’s Research Council Executive Board

Henrik O. Madsen appointed chairman of the executive board of the Research Council of Norway   DNV GL president and CEO Henrik O. Madsen was appointed as chairman

Port of Houston Expecting Record Year

The Port of Houston Authority is expecting 2014 to close as a banner year for the port, with 34 million tons of cargo handled through November, Executive Director

Hapag-Lloyd Completes CSAV Merger Capital Increase

Hapag-Lloyd completed the planned capital increase of EUR 370 million (approximately $452.5 million) as part of the business combination with the Chilean shipping

Marine Power

Keeping to the Schedule in the Pacific Northwest

When a tightly scheduled repower for the Kodiak-based trawler Sea Mac in early December took a very bad turn, Mike Fourtner used his 25 years of fishing experience

New Chinese Shipyard Launches First Ship

The new shipyard facility of Honghua Offshore Oil & Gas Equipment Company in Jiangsu, China, has launched its first ship, an IMT982 Platform Supply Vessel. The vessel,

Multraship Buys Three More Tugboats from Damen

Multraship and Damen Shipyards Group agreed on three new ASD (Azimuth Stern Drive) Tugs, all for delivery to Multraship in 2015. After delivery in Vietnam, scheduled

Naval Architecture

MSC Oscar is the World’s Largest Containership

MSC Oscar, the newest cargo vessel built for Mediterranean Shipping Company (MSC), will launch in January 2015, and at 19,224 teu, the containership will take the record for world’s largest.

Waterjet-propelled Crewboat Delivered to Petrobras

BS Camburi, a 36-meter Monohull Crewboat built in Brazil by Arpoador Engenharia to the Petrobras type P2 specification has been launched and delivered.   Designed by Incat Crowther,

Damen Responds to Evolving Fishing Practices

Maaskant Shipyards Stellendam meets fishing sector’s growing needs by performing electric pulse fishing conversions   As European fishing policies evolve, so fishing techniques advance.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2750 sec (4 req/sec)