Northrop Grumman Honors Employees Lost in 'USS Thresher'

Press Release
Monday, April 29, 2013
USS Thresher: Photo courtesy of Arlington National Cemetery

Northrop Grumman Corporation has donated $5,000 toward construction of a memorial to the Navy submarine 'USS Thresher'.

The company has made this donation in memory of two employees who perished when the Thresher sank in the Atlantic Ocean 50 years ago.

Northrop Grumman Sperry Marine employees Kenneth R. Corcoran and Donald T. Stadtmuller were performing work on the Thresher's gyroscope when the submarine sank during deep-diving tests approximately 200 miles off New England in April 1963. All 129 military crewmen and civilian technicians onboard perished.

Prior to his employment as a field service engineer for Sperry Marine, Corcoran was a 20-year Navy veteran who had retired as a lieutenant. Corcoran was 46, leaving behind a wife and three sons.

Stadtmuller had graduated from Union College in Schenectady, N.Y., in 1958 with a bachelor's degree and had made a number of previous trips aboard Thresher as a field engineer for Sperry Marine. Stadtmuller was 26 years old when he died aboard the submarine.

"It is our honor to contribute to the memorial recognizing our employees and the dedicated crew of the Thresher," said Bill Hannon, vice president of Northrop Grumman Maritime Systems. "Their sacrifices serve as a reminder that there will always be dangers inherent in the vital work of maintaining global security."

Funded by outside donors, the Thresher Memorial features a 129-foot flagpole in a memorial courtyard with granite plaques from more than 250 contributors. The memorial is in Kittery, Maine, adjacent to the Portsmouth Naval Shipyard where the Thresher was based.
 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Odfjell Drilling in Tighter 2Q North Sea Market

Odfjell Drilling reports second quarter 2014 financial results showing a profit of US$29-million. Profit & loss Q2 2014 Operating revenue for Q2 2014 was USD 272 million (USD 289 million),

Brazil AHTS Contract Breakthrough for Havyard

Havyard says it is to deliver the ship design and equipment for four anchor handling tug supply (AHTS) vessels that are to be built and operated by the Brazilian

Darwin, Australia Scene of KAKADU Exercise Planning

Over 1,200 military personnel from the Asia Pacific and Indian Ocean regions have completed collaborative, tactical warfare planning during the first week of the

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Pipelines Pod Propulsion Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1806 sec (6 req/sec)