Technip Wins Key Offshore Engineering Contract

Press Release
Wednesday, May 02, 2012

Texas-based Technip awarded a key engineering contract for 'Mad Dog Phase 2' in the Gulf of Mexico

Technip was awarded a front end engineering design (FEED) contract by BP Exploration & Production Inc. This contract covers the design of a Spar* hull and mooring systems for the Mad Dog Phase 2 Project, located  near Green Canyon Block 825 in the Gulf of Mexico.

This first award comes under the framework of the 10-year Spar platform master services agreement signed in 2011.

The Mad Dog Phase 2 Spar will be located near the first Mad Dog Spar delivered by Technip for BP in 2004, and installed on Green Canyon 782. Detailed engineering for the new Spar is scheduled to start during the second half of 2012.

Technip’s operating center in Houston, Texas, will execute the contract with support from the center in Pori, Finland.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

W&O, LESER Partner to Deliver Safety Relief Valves

W&O, a global supplier to the marine and upstream oil and gas markets for pipe, valves and fittings, valve automation and engineered solutions, has partnered with

Fednav Celebrates Anniversary Trio in Cleveland

Fednav Limited held a reception on board one of its vessels, the Federal Mayumi, at the Port of Cleveland yesterday to celebrate a trio of anniversaries: the 70th

Karl Senner Inks Distribution Deal with Electronic Power Design

Karl Senner, LLC (KS) has reached a new strategic representation agreement with Electronic Power Design (EPD). Karl Senner, LLC now represents EPD in the United States marine and offshore Markets.

Energy

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

Massive LNG Absorber Shipped to Malaysia

Successful transport of 1,480t absorber for biggest LNG plant worldwide in Malaysia.   1,480 tons and a high center of gravity made the transport of an absorber

EU: Ships Will Measure CO2 Emissions

Shippers to begin monitoring from 2018; Environmental groups say law is weak, shippers favorable. The shipping sector will for the first time have to monitor

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1361 sec (7 req/sec)