Aker Wins Equipment Contract in Malaysia

SeaDiscovery.com
Tuesday, June 25, 2013
Aker splitter wellhead system (Photo: Aker Solutions)

Aker Solutions has signed an agreement with Murphy Sarawak Oil Co. to deliver as many as 24 sets of splitter wellhead systems.

The contract, which includes deliveries of ancillary equipment and services, is worth $15 million over three years and may be extended by a year.

Surface wellheads are used on land-based and shallow-water platforms for drilling and production equipment.

Murphy will use the equipment in Block SK 309/311, off the coast of Sarawak in East Malaysia.

"This is the first major surface wellhead contract for Aker Solutions in Malaysia," said Dave Hutchinson, head of Aker Solutions' subsea operations in Asia.

Aker Solutions' splitter wellhead system enables drilling of two or more wells from a single well slot on a platform. This reduces the number of well slots needed by at least 50% and consequently requires less deck space.

Most of the equipment will be produced at Aker Solutions' dedicated surface wellhead manufacturing facility in Batam in Indonesia while Aker Solutions' Port Klang facility in Malaysia will produce the Shear-Safe surface gate valve actuators. The latter are used in the splitter wellhead system to improve the management of oil and gas flow under pressure.

Engineering and project management will take place at Aker Solutions' offices in Kuala Lumpur and Singapore.

www.akersolutions.com

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

LNG Ferry Construction for Tallink Begins

The start of production of Tallink's new generation LNG powered fast ferry for the Tallinn-Helsinki route was celebrated on the 4th of August 2015 at Meyer Turku shipyard.

FMC Collects $1,227,500 in Penalties from NVOCC's

Federal Maritime Commission Chairman Mario Cordero announced that the Commission has completed compromise agreements recovering a total of $1,227,500 in civil penalties.

Marine Equipment

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

LNG Ferry Construction for Tallink Begins

The start of production of Tallink's new generation LNG powered fast ferry for the Tallinn-Helsinki route was celebrated on the 4th of August 2015 at Meyer Turku shipyard.

NYK Hosts Safety Conference

Over three dates in July, NYK hosted a safety promotion conference for shipowners and ship-management companies at the NYK head office in Tokyo and at Imabari city in Ehime prefecture.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2410 sec (4 req/sec)