Huisman Banks 10 Pipelay Equipment Orders

MarineLink.com
Monday, August 12, 2013
Photo: Huisman

Huisman, a worldwide specialist in lifting, drilling and subsea solutions, has secured new contracts for 10 pipelay systems with various major offshore pipelay contractors. The new contracts include three 550mt Tiltable Lay Systems (TLS) and one 325mt Vertical Lay System (VLS) for Subsea 7, two 650mt TLS and two 340mt VLS for Technip-DOF, one 275mt VLS and one 570mt Multi-lay System for Ceona. The equipment will be built at the various Huisman production facilities in The Netherlands, Czech Republic, China and Brazil. Delivery of these pipelay systems is scheduled between the end of this year and early 2017.

The orders for the three 550mt TLS for Subsea 7 and the two 650 and two 340mt TLS for Technip-DOF are all part of their contract with Petrobas. The three Subsea 7 TLS will all be equipped with a sophisticated Huisman squeeze system to accurately control squeeze loads. Moreover, all tensioners will be retractable, which allows for safe and efficient installation of large subsea infrastructure components such as umbilicals, risers and flowlines. The vessels for Subsea 7 will be built by IHC, The Netherlands. Technip-DOF’s order for two TLS includes baskets and two 50mt SMST knuckle boom cranes, which allow for deck handling and deep water operation. The vessels for the two 650mt will be built by VARD in Norway and the vessels for the two 340mt will be built by VARD in Brazil. Delivery of the final pipelay system for these orders is scheduled for early 2017.

An additional contract for Subsea 7 includes a 325mt VLS for their new built DP3 Heavy Construction and Flexible Pipelay Vessel, which will be built by Korean shipyard Hyundai Heavy Industries Co. Ltd. (HHI). Besides the pipelay system, Huisman will also deliver a 600mt AHC subsea crane for this vessel. Delivery is scheduled for 2015.

The orders for Ceona include pipelay systems for their vessels the Polar Onyx and the Ceona Amazon. The latter, a multi-function, dynamically positioned construction vessel, will be built based on a Huisman vessel design. The highly integrated and fully optimized vessel will have exceptional sea keeping characteristics, with a maximized deck area and a weather window with limited vessel dimensions. This design includes a project area of 4600m2, which allows for further storage of line pipe and standard flexible installation reels. The pipelay system consists of an inclinable lay system with a top tension of 570mt and a rigid pipeline firing line system. The vessel can lay rigid pipelines, flexible pipelines and umbilicals, and can install large subsea structures using one or both of her 400mt subsea cranes, also built by Huisman. The Ceona Amazon will be built by Lloyd Werft, and the Huisman equipment is scheduled for delivery in 2014. The 275mt VLS for the “Polar Onyx” will be delivered in 2014 as well.

huismanequipment.com
 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

NORDEN Publishes CSR Report

Dampskibsselskabet NORDEN A/S has published its Corporate Social Responsibility (CSR) report 2014. Entitled, “On track”, the CSR report presents an overview of NORDEN’s CSR strategy,

LISCR Appoints New Managing Director for Hong Kong

The Liberian Registry has appointed shipping executive Gerry Buchanan as managing director of its dedicated Hong Kong office, the registry announced today.      As

Wheelabrator Opens Ontario Location

Surface preparation company Wheelabrator Group (Canada) Ltd. celebrated its grand opening with a ribbon cutting ceremony and luncheon after moving to a new location and office complex in Burlington,

Contracts

ECO Orders Rolls-Royce Equipment for New AHTS

Rolls-Royce has been awarded a contract worth $30.6m with the American owner Edison Chouest Offshore (ECO). The contract for ship equipment comprises Azimuth main propulsion,

Seadrill: Rig Rates Have Not Bottomed

The market for oil and gas drilling rigs continues to deteriorate as oil companies cut back on investments, Seadrill Chief Financial Officer Rune Magnus Lundetrae

Kvichak, Vigor Announce Merger

Merger positions combined company to play a dominant role in recapitalization of North Pacific fishing fleet and emerging Arctic oil gas operations. Kvichak

News

NORDEN Publishes CSR Report

Dampskibsselskabet NORDEN A/S has published its Corporate Social Responsibility (CSR) report 2014. Entitled, “On track”, the CSR report presents an overview of NORDEN’s CSR strategy,

Fire Aboard US Navy Ship

A fire broke out aboard a U.S. Navy amphibious dock landing ship USS Gunston Hall (LSD 44) at approximately 2 p.m. yesterday while the ship was undergoing maintenance

Wheelabrator Opens Ontario Location

Surface preparation company Wheelabrator Group (Canada) Ltd. celebrated its grand opening with a ribbon cutting ceremony and luncheon after moving to a new location and office complex in Burlington,

Marine Equipment

Pronomar, ELA Cooperation Continues

Drying container exhibited again on EWEA in Copenhagen   In October 2014 Pronomar shared news about its cooperation with German based company ELA Container Offshore

Wheelabrator Opens Ontario Location

Surface preparation company Wheelabrator Group (Canada) Ltd. celebrated its grand opening with a ribbon cutting ceremony and luncheon after moving to a new location and office complex in Burlington,

Caterpillar to Deliver Highest Horsepower Tier 4 Solution

Edison Chouest Offshore has selected Caterpillar Marine's Cat Tier 4 Final C280-16 generator sets for two new vessels, Caterpillar announced today. The generators

Deck Machinery

ECO Orders Rolls-Royce Equipment for New AHTS

Rolls-Royce has been awarded a contract worth $30.6m with the American owner Edison Chouest Offshore (ECO). The contract for ship equipment comprises Azimuth main propulsion,

Liebherr Reports Record Year for Offshore Cranes

With 87 units delivered in 2014, Liebherr offshore cranes achieved a new per year delivery record, more than doubling its delivery numbers from 2012. And according to Liebherr,

In Safety, Quality Comes First

Benchmarked, standardized and customizable – Rapp Marine’s array of crane options safely cover the full gamut of workboat needs. In the marine industry, one of

Underwater Engineering

E-marine Begins Fleet Expansion

E-marine, a provider of submarine cable installation and repair solutions in the Middle East and Sub-Continent region, has unveiled plans to expand its fleet of cable ships in 2015,

ThyssenKrupp Says Submarines Part of Growth Story

Germany's Thyssenkrupp sees its submarine business as making an important contribution to its growth targets, the head of its Industrial Solutions business area said on Tuesday.

Ice Coverage on Great Lakes 89 pct: NOAA

Ice coverage on the Great Lakes is nearing 90 percent, reveals high resolution satellites images from National Oceanic and Atmospheric Administration (NOAA).   The entire Great Lakes is at 88.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.7144 sec (1 req/sec)