Seaspan’s Selects PEMA Equipment for NSPS Project

Press Release
Thursday, March 07, 2013
Photo: PEMA

The National Shipbuilding Procurement Strategy (NSPS) is an initiative of the Canadian Government to build new ships for the Royal Canadian Navy and Canadian Coast Guard. Seaspan’s Vancouver Shipyards won the right to bid on the non-combat vessels under this strategy, and as such is proceeding with a $200 million Shipyard Modernization Program to support execution. As a part of modernization project, Seaspan selected PEMA welding automation equipment for their panel production.

The contract includes a PEMA one-side welding station and stiffener mounting and welding stations equipped with PEMA WeldControl 100 system. The line is also equipped with a special covered conveyor solution to make working on the line safer and to transport welded panels smoothly.

Seaspan chose the PEMA automation due to the strategic co-operation between Pemamek Oy Ltd. and Lincoln Electric Co. The PEMA welding automation lines use Lincoln PowerWave welding power sources. Lincoln and PEMA equipment together made the solution unique and suitable for shipyard’s needs.
 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Regulations Threaten Superyacht Innovation

To increase innovation within the superyacht industry, designers need to work with flag states, classification societies and naval architects to ensure regulations are workable, as said by experts.

News Flash! Greek Shipowners Prefer Bulkers

The buying interest from Greek ship owners is focused on bulkers to an increasing extent, BIMCO said. Data from VesselsValue.com reveal that Greek owners were at

Ship Repair & Conversion

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Combat Cold Corrossion via Condition Monitoring

Parker Kittiwake explains why frequent condition monitoring is the most effective measure in combating the recent cold corrosion phenomenon The recent trend in

Hyde Marine, Goltens Enter Engineering Agreement

Hyde Marine, Inc., announced today it has launched an agreement with Goltens Green Technologies division to help shipowners determine how to best fit the chemical

Navy

The Martitime Security Focus Is Shifting

Former Vice-Admiral and Commander-in-chief of the German Navy Hans-Joachim Stricker, President of the German Maritime Institute (DMI), believes that in terms of

VSTEP Wins Mexican Navy Simulator Contract

The Mexican Navy selected VSTEP to supply a Class A NAUTIS Full Mission Bridge (FMB) Simulator and 24 NAUTIS desktop trainer stations for the Naval Academy in Veracruz.

Today in U.S. Naval History: July 29

Today in U.S. Naval History - July 29 1846 - Sailors and Marines from U.S. sloop Cyane capture San Diego, Calif. 1918 - Assistant Secretary of the Navy Franklin D.

Marine Equipment

Messer's CEO Norville Announces Retirement

Bill Heller to assume the position as Messer Cuttings Systems’ President and CEO Gary Norville started at Messer Cuttings Systems Inc. in September 1980 selling and installing cutting machines.

XtendFRESH Now Available from Carrier Transicold

The XtendFRESH atmosphere control system, which preserves quality and extends shipping distances for perishables shipped in refrigerated containers, is now available from Carrier Transicold.

Voith to Exhibit High Efficiency and DP Systems at SMM

At this year’s SMM in Hamburg, Voith will showcase propulsion systems and vessel concepts focusing on high efficiency and dynamic positioning even under challenging conditions.

Coast Guard

Charter Boat Crew Rescued in Gulf of Mexico

U.S. Coast Guard search and rescue crews worked throughout the night to find a missing charter boat with four people aboard as far as 70 miles off Galveston. A

Grounded Freighter Refloated in Lake St. Clair

The Federal Rideau, a 656-foot freighter that had been hard aground in the downbound shipping channel of Lake St. Clair since early Sunday morning, was refloated

USCG Assists Stranded Charter Vessel

U.S. Coast Guard (USCG) crews are assisting a disabled passenger vessel approximately 13 miles east of Nahant, Massachusetts, Monday. Watchstanders at Coast

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1983 sec (5 req/sec)