Algerian Reggane Nord Gas Project entering execution phase

By Joseph R. Fonseca
Sunday, May 18, 2014
Reggane Nord gas project

 

A project consortium that includes RWE Dea has signed a major contract for the construction of a natural gas processing plant and infrastructure in the Algerian Sahara for the Reggane Nord project. The contract is valued at US$976 million and represents an important step forward for the project.

Representatives of the Groupement Reggane of which RWE Dea is a partner signed the contract to construct the natural gas processing facilities and corresponding infrastructure including the gathering network and export pipeline on Thursday. The USDollar976 million contract was awarded to Petrofac International (UAE) LLC and stipulates completion of the facilities within 36 months.

After completion the plant will be operated with a gas troughput capacity of around 283 million cubic feet per day.

The Groupement Reggane partners are RWE Dea AG with its 19.5%-share, the Algerian enterprise Sonatrach (40%), Repsol from Spain (29.25%), and Edison from Italy (11.25%).

"With the construction start of these facilities, we've achieved a very important milestone in this development project. We are pleased to be moving this project forward into the execution phase," remarked Christoph Schlichter, Senior Vice President Production North Africa of RWE Dea AG. "We are concurrently driving ahead all project activities for start of production, which is scheduled for summer 2017."

A total of 26 development wells are planned to be completed during the first drilling campaign. The Groupement already awarded the rig contract in March this year to secure the necessary rig capacity for drilling and completion.

A successful 3D seismic campaign was also completed in the concession area in April this year. The seismic covered an area of 1,450 square kilometres. The acquired data, which is currently being processed and interpreted, will complement the extensive information already collected on previous seismic campaigns and enhance the detail and quality of information about subsurface structures of the various reservoirs.

“The project’s expected reserves will make a significant contribution to the growth of RWE Dea’s gas production in the years to come,” said Dirk Warzecha, Chief Operating Officer of RWE Dea AG.In 2002, RWE Dea started exploration activites in the concession area Reggane Nord together with partners Sonatrach, Repsol (operator) and Edison with corresponding gas discoveries. Capital expenditures will total approximately USDollar3 billion for the development project. The production phase of the project is expected to span more than 25 years.
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Asia Tanker, VLCC Rates Could Climb

Charterers to release 30 Middle East VLCC cargoes next week. VLCC market buoyed by upbeat Suezmax, Aframax sectors. Rates for very large crude carriers (VLCCs)

Finance

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Oil Deal Between Iraqi Kurdistan & Baghdad Welcomed

The United States welcomes an agreement between Iraq's central government in Baghdad and its northern Kurdistan region over the management of oil exports, U.

Nigeria to Cut Petrol Subsidy by Half

Nigeria plans to cut subsidies on petroleum products by half next year after sharp falls in global crude prices, spurred the government to revise its 2015 budget downwards,

LNG

HHI to Build FSRU for Höegh LNG

A new Floating Storage and Regasification Unit (FSRU) will be built by the Korean shipbuilding Company Hyundai Heavy Industries (HHI). This FSRU will be the fifth

BG Group's Queensland Curtis LNG to Ship First Cargo

BG Group is set to ship the first cargo of liquefied natural gas from its flagship gas project Queensland Curtis LNG on Dec. 20, a source familiar with the matter told Reuters.

Europe Stockpiling Low Cost, Surplus LNG

Demand from top Asian buyers drops sharply; Asian, European gas price spreads converge. Europe set to becoming dumping ground for LNG. Europe is set to become

News

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1871 sec (5 req/sec)