BOEM Approves First BP Exploration Plan in GOM

(Press Release)
Friday, October 21, 2011

The Bureau of Ocean Energy Management (BOEM) approved a supplemental Exploration Plan (EP) submitted by BP for deepwater oil and gas activities. BOEM conducted a site-specific Environmental Assessment (EA) of the activities described in the plan. This is the 44th plan that has been approved following the completion of a site-specific EA since stronger regulations were implemented in June 2010. Prior to any drilling under the plan, BP must obtain drilling permits from the Bureau of Safety and Environmental Enforcement (BSEE), which will continue to assess the information that is necessary to allow specific activities.
This is the first EP that BP has had approved since the 2010 Deepwater Horizon explosion and subsequent oil spill. Before approving this EP, BOEM confirmed BP’s compliance with the bureau’s rigorous, heightened standards established following the Deepwater Horizon tragedy. In July 2011, BP announced additional safety enhancements and performance standards they would voluntarily implement in connection with its deepwater drilling operations in the Gulf of Mexico. BOEM has verified that BP has met the relevant voluntary performance standards.
“BOEM is dedicated to ensuring that the development of the nation’s energy resources is conducted in a safe and environmentally responsible manner,” said BOEM Director Tommy Beaudreau. “Our review of BP’s plan included verification of BP’s compliance with the heightened standards that all deepwater activities must meet.”
The supplemental EP proposes to drill up to four wells in the Gulf of Mexico’s Keathley Canyon Blocks 292 and 396, which BP acquired in lease sales in 1997 and 2003. An EP describes all exploration activities planned by an operator on a specific lease or leases, including the anticipated timing of these activities, information concerning drilling vessels, the location of each planned well, and other relevant information. The water depth at the proposed well sites range from 6,019 to 6,034 ft and are located 192 miles from the nearest Louisiana shoreline.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

DNV GL Issues Design Guidelines for DP Operations

Advanced dynamic positioning (DP) vessels can now meet critical safety regulations while gaining operational flexibility, efficiency and cost savings through new design and monitoring methods.

USCG Suspends Search for Missing Mariner off Lanai

The Coast Guard suspended the search Monday for a missing mariner after the fishing vessel he was aboard capsized approximately one mile west of Lanai. “Following extensive efforts by sea,

Petrobras Requests to Assist the Federal Prosecutors Office

On April 24, Petrobras submitted a request to assist the Federal Prosecutors Office in seven criminal lawsuits related to Operação Lava Jato (Operation Car Wash),

Offshore

DNV GL Issues Design Guidelines for DP Operations

Advanced dynamic positioning (DP) vessels can now meet critical safety regulations while gaining operational flexibility, efficiency and cost savings through new design and monitoring methods.

CEVA Appoint Two Sr Executive

Hoofddorp, the Netherlands, 27 April, 2015 – CEVA Logistics, one of the world's leading supply chain companies, today announced the appointment of two senior

Floating LNG Regasification is Used in Smaller Markets

According to the latest research from the US Energy Information Administration (EIA), floating LNG (FLNG) regasification is being used to meet rising natural gas demand in smaller markets.

Maritime Safety

DNV GL Issues Design Guidelines for DP Operations

Advanced dynamic positioning (DP) vessels can now meet critical safety regulations while gaining operational flexibility, efficiency and cost savings through new design and monitoring methods.

USCG Suspends Search for Missing Mariner off Lanai

The Coast Guard suspended the search Monday for a missing mariner after the fishing vessel he was aboard capsized approximately one mile west of Lanai. “Following extensive efforts by sea,

"River Cities" Host First Navy Week of 2015

Bossier City-Shreveport Navy Week begins April 27 and will continue through May 3. Navy Weeks focus a variety of assets, equipment and personnel on a single

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1344 sec (7 req/sec)