Fabrication of Aegis Destroyer 'John Finn' Starts at Inglalls

Press Release
Tuesday, September 11, 2012
Photo credit Ingalls

Huntington Ingalls Industries starts work on the 29th 'Arleigh Burke'-class destroyer to be built at its Ingalls Shipbuilding Division.

The start of fabrication milestone signifies that 100 tons of steel have been cut for DDG 113. Ingalls uses state-of-the-art robotic cutting machines to ensure the steel is cut and fabricated to exact Navy specifications. John Finn is expected to be delivered to the Navy in the third quarter of 2016.

Ingalls also has a contract to build a 30th destroyer, Ralph Johnson (DDG 114), with start of fabrication scheduled for 2013.

DDG 113 is named to honor John Finn, a Medal of Honor recipient who Adm. Chester Nimitz said displayed "magnificent courage in the face of almost certain death" during the attack on Pearl Harbor in 1941.

Ingalls has delivered 28 DDG 51 ships to the U.S. Navy. The company's 28th ship, William P. Lawrence (DDG 110), was commissioned on June 4, 2011, in Mobile, Ala. and was the most complete DDG at time of sea trials in the history of the program at Ingalls.

"This is a significant day for our company and for the U.S. Navy as Ingalls once again builds on the long legacy of surface combatant construction with the start of fabrication on DDG 113," said Bob Merchent, Ingalls' vice president, surface combatants and U.S. Coast Guard programs. "We have delivered 28 of these ships to the U.S. Navy, and our experienced and talented shipbuilders stand more than ready to produce new quality destroyers."



 

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

DNV GL’s Synergi to Manage Siem Offshore Newbuilding Projects

Siem Offshore has chosen DNV GL’s Synergi Project to manage nine newbuilding projects. Synergi Project software The software is used to optimize the collaboration

Bahri Inks Contracts with Hyundai to Build 5 VLCCs

The National Shipping Co. of Saudi Arabia (Bahri) signed contracts on Thursday with Hyundai Samho Heavy Industries (HSHI) to build five very large crude carriers (VLCCs),

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

Navy

Libyan War Plane Bombs another Tanker

A fighter jet operated by Libya's military force backed attacked an oil tanker that was about to anchor in the northern city of Sirte, reports local media.   Lt Gen.

US Navy Submarine to be Named USS New Jersey

The U.S. Navy's next Virginia-class attack submarine will bear the name USS New Jersey, says AP reports.   U.S. Secretary of the Navy Ray Mabus hosted a ship-naming

USS George Washington Completes Carrier Qualifications

Carrier Air Wing (CVW) 5 and the Nimitz-class aircraft carrier USS George Washington (CVN 73) completed its carrier qualifications (CQ), May 23. CQ allows

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Offshore Oil Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1256 sec (8 req/sec)