AUSTAL STARTS FABRICATION OF JHSV 3

Sunday, October 09, 2011

Austal announces that Congressman Jo Bonner (R-AL) commemorated the official start of fabrication for the third Joint High Speed Vessel (JHSV 3), one of seven Austal-designed 103-meter U.S. Navy Joint High Speed Vessels (JHSV) under contract with the U.S. Department of Defense.


“The race is on,” said Austal USA President and Chief Operating Officer, Joe Rella, “the world is about to learn just how much value Austal’s investments in modular ship fabrication offers our Navy and Military Sealift Command customers.  We challenge ourselves every day to build each ship faster and more efficiently than the one before.”  By the time the first Joint High Speed Vessel USNS Spearhead (JHSV 1), was Christened on September 17, 2011, the first of over forty modules of JHSV 2, had moved from Austal’s Module Manufacturing Facility (MMF) to the final assembly bay, where the ship will take shape. Austal was selected as prime contractor in November 2008 to design and build the first JHSV, with options for nine additional vessels expected to be exercised between FY09 and FY13 as part of a program potentially worth over US$1.6 billion.


“Austal and Mobile are becoming synonymous for high speed defense on the water,” said First District Congressman Bonner.  “By supporting this facility, we are not only bolstering employment here at home, we are investing in security.  The facility and workforce here are ramping up and ready to help the Navy and Marine Corps meet the naval challenges of tomorrow.  Austal’s shipyard is certainly one of a kind.  Their state of the art modular manufacturing process represents a new more efficient direction in Navy shipbuilding, and it’s exciting to see these amazing vessels transition from start to finish, right here, in Mobile.”

 

As the U.S. Department of Defense’s next generation multi-use platform, the 103-meter JHSV will provide rapid intra-theater deployment/transportation of personnel, equipment and supplies. The vessel will support military logistics, sustainment and humanitarian relief operations at speeds of up to 43 knots. The JHSV will transport medium-size operational units with their vehicles, or reconfigure to provide troop transport for an infantry battalion, allowing units to transit long distances while maintaining unit integrity. The vessel also supports helicopter operations and has a slewing vehicle ramp on the starboard quarter which enables use of austere piers and quay walls, common in developing countries. A shallow draft (under 4 meters) will further enhance theater port access.
 

JHSV 3 is the fourth naval vessel to be constructed at Austal using the new procedures and processes developed in conjunction with Austal’s Module Manufacturing Facility (MMF). The MMF provides Austal with assembly line efficiency, which has resulted in significant cost savings and reduced lead times for both of our Navy programs. Austal USA is also currently preparing to launch a second Independence-variant 127-meter Littoral Combat Ship (LCS) class vessel for the U.S. Navy, Coronado (LCS 4). USS Independence (LCS 2) is currently being put through trials by her crew. As prime contractor for the next LCS 10-ship contract, awarded by the U.S. Navy at the end of 2010, Austal has also begun work on the first ship of that contract, Jackson (LCS 6), with Montgomery (LCS 8) under contract.


For the LCS and JHSV programs, Austal is teamed with General Dynamics Advanced Information Systems, a business unit of General Dynamics (NYSE: GD). As the ship systems integrator, General Dynamics is responsible for the design, integration and testing of the ship’s electronic systems including the combat system, networks, and seaframe control. General Dynamics’ proven open architecture approach provides affordable capabilities to the fleet quickly and efficiently. With its 13-year anniversary approaching, Austal has grown into one of Southern Alabama’s largest employers with over 2,300 employees on staff hailing from the Mobile Area, Mississippi, Florida, and beyond.  Under the current workload, Austal expects to employ over 4,000 Americans by the end of 2013, and will be ready to help the U.S. Navy meet any national security contingency ahead.
 

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Everett College to Launch New Research Boat

Everett Community College’s Ocean Research College Academy (ORCA) will launch its new research vesel on November 22 with a celebration at 11 a.m. at the Port of Everett.

Video: Reefer RoRo Ship Design Rebooted

Expanding on the Reefer RoRo Ship design release in September last year, naval architects group Knud E. Hansen A/S has continued the development of the new Reefer RoRo Ship design with version II.

Navy

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Australia: Maritime SAR in Asia Pacific a Priority

Defense force personnel from Australia are in China for Exercise Cooperation Spirit 2014 which begins today. The exercise aims to enhance coordination and cooperation between Australia,

Eye on the Navy

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Australia: Maritime SAR in Asia Pacific a Priority

Defense force personnel from Australia are in China for Exercise Cooperation Spirit 2014 which begins today. The exercise aims to enhance coordination and cooperation between Australia,

Government Update

Nigeria to Cut Petrol Subsidy by Half

Nigeria plans to cut subsidies on petroleum products by half next year after sharp falls in global crude prices, spurred the government to revise its 2015 budget downwards,

Venezuela Ships First Crude Mixed with Algerian Oil to China

Venezuela is sending its first shipment of crude mixed with Algerian light oil to China, according to state oil company PDVSA and traders.   Venezuela recently

China Building Island Big Enough for Airstrip

Satellite images show China is building an island on a reef in the disputed Spratly Islands large enough to accommodate what could be its first offshore airstrip in the South China Sea,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3849 sec (3 req/sec)