STX Finland’s Shipyard Gets Reseach Vessel Order

Thursday, February 17, 2011

STX Finland Oy and Ministry of Fisheries and Marine Resources of the Republic of Namibia have, on 11.2.2011, signed a contract for the construction of a fisheries research vessel. The ship, with a contract value of approximately EUR 35 million, will bring some 250 man-years of labour to STX Finland’s Rauma shipyard, with delivery scheduled for spring 2012. This versatile specialized vessel will be approximately 62 metres long and will provide accommodation for 45 crew members and research personnel.

The research vessel is specifically designed for the purposes of Namibian fisheries research. The vessel meets the latest standards set for this type of vessels requiring, in particular, special care in the design of laboratory equipment, propulsion and power generation system. The vessel also has very high overall technical standards and special attention has been given to the vessel’s serviceability and low maintenance costs. Furthermore, the ship features a dynamic positioning system and it is operational in any African sea and weather condition in all seasons with no restrictions.
The tasks of the research vessel include monitoring of fish stock, as well as sorting, processing, freezing and storage of fish. The multi-purpose specialized vessel will also be used for collecting biological samples for seabed research and analysis and provide assistance for control of fishing. The vessel also features facilities for meteorological research.
“This order is very important for STX Rauma shipyard. The contract now signed shows that the shipyard has succeeded very well in its long-term research and development efforts focused on specialized vessels,” said Timo Suistio, Director of STX Rauma shipyard. “The R&D will continue with the construction of the research vessel now ordered by Namibia. In the design we can apply the same technologies as in the icebreaker for research purposes ordered by theSouth African Department of Environmental Affairs, to be delivered in 2012, since the two vessels, to a certain extent, carry out similar tasks and use the same kind of equipment. In the case of the fisheries research vessel, the areas for further development include enhanced hydroaccoustic characteristics and hull protection techniques.”
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


TMS Cardiff Gas Orders First LPG Carriers

TMS Cardiff Gas Ltd. has signed a contract with Hyundai Heavy Industries of Korea for the construction of two 78,700 cbm LPG carriers with the option to build another two.

Japan’s First ME-GI Engine Passes Factory Tests

The factory acceptance test (FAT) of the first ME-GI engine in Japan recently took place at the Tamano Works of Mitsui Engineering & Shipbuilding Co., Ltd. (MES),

Damen's Third Ferry for South Korea

All good things come in threes as Damen delivers the third vessel of the year, from the Damen Fast Ferry (DFFe) series to South Korean operators. Having already

Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1540 sec (6 req/sec)