Marine Link
Saturday, September 24, 2016

Gladding-Hearn Gets Bermuda Ferry Contract

January 24, 2001

Gladding-Hearn Shipbuilding has begun construction of two new fast ferries for the Governemnt of Bermuda, Ministry of Transport. The first vessel will be delivered in September, followed by a second in early 2002.

The Somerset-Mass., Shipyard was chosen from among 12 yards from four countries - Australia, Norway, Denmark and theU.S. - that competed for the project.

Designed by Incat Designs, Sidney, Australia, the 250-passenger ferries will be part of a new "seamless" transportation system involving integrated docks for bow loading and electronic tickets that will be compatible with the government's bus system, explained government officials.

Each all-aluminum vessel measures 84 ft. (25.72 m) long, 30 ft. (9.2) abeam, and draws 5.3 ft (1.6 m).

The vessels will be powered by twin Detroit Diesel 12V-2000 engines, each delivering 965 bhp (720 BkW) at 2,100 rpm. They drive five-bladed Ni-Br-Al (nickel-bronze-aluminum) propellers via ZF 2.5:1 reverse/reduction gears. When fully loaded the vessels are expected to reach a top speed of 25 knots.



Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News