Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Recording Equipment News

17 Dec 2019

Seabed Geosolutions Sells OBC System

Seabed Geosolutions, the provider of comprehensive ocean bottom seismic (OBS) solutions to the global oil and gas industry, has signed a contract to sell the entirety of its shallow water ocean bottom cable (OBC) recording equipment.The joint venture between Fugro and CGG said that the equipment was used on a recently completed project for Abu Dhabi National Oil Company in the United Arab Emirates. The sale fetched around  US$ 10 million.Stephan Midenet, CEO of Seabed Geosolutions said: "The sale of our last cable-based system completes the transformation of Seabed Geosolutions into a pure ocean bottom node (OBN) company."He added: "We are now largely focused around our Manta suite of technologies…

12 Jul 2018

SeaBird Exploration Acquires Geowave Voyager

SeaBird Exploration announced it is in an exclusive process to acquire the seismic vessel Geowave Voyager and certain seismic equipment from Exploration Vessel Resources II AS, a wholly owned subsidiary of CGG S.A., for a cash consideration of $17 million.SeaBird intends to carry out a private placement of new shares in the company raising gross proceeds of minimum NOK 80 million and maximum of NOK 120 million. The subscription price  in the Private Placement will be determined through an accelerated book-building process. The net proceeds from the Private Placement will be used to finance the Transaction and for general corporate purposes.The company is currently in an exclusive process with CGG to acquire the seismic vessel Geowave Voyager…

28 Mar 2017

Simulation: The Centre for Marine Simulation

Photo: The Centre for Marine Simulation

St. CMS operates a range of marine simulation equipment that covers a broad range of marine and offshore activities. Much of the equipment is highly specialized and unique including fully motion capable simulators. The center also provides technical management and support of simulation equipment that is used by other parts of the Marine Institute. CMS simulation activities can be divided into three main areas; Training, Industrial Response, and Applied Research. To support these…

26 Sep 2003

ABP Awards Transas VTS Contract

Transas Marine (UK) Ltd. has recently gained a contract to supply a Vessel Traffic Services (VTS) system for Associated British Port’s (ABP) South Wales Ports - Cardiff, Barry, Newport, Swansea and Port Talbot. The contract was awarded by ABP South Wales after extensive market assessment and a comprehensive tendering procedure. The Transas VTS system meets ABP’s primary requirements and responsibilities as the Statutory Harbour Authority for its ports, which are the management of shipping, the safety of navigation for all harbour users and the protection of the marine environment. The new system will support ABP by providing the duty Marine Officer with navigational information such as vessel position, vessel movements, timings and speed.

25 Mar 2002

IMO Meeting Approves Measures on Ballast Water Management

Ballast water management is to become a major consideration in the design of new vessels following the approval by IMO of a series of measures aimed at reducing the harmful effects of marine organisms transported in ballast water and the risks involved in some ballast water management techniques. The 47th session of the International Maritime Organization’s Marine Environment Protection Committee (MEPC), which met from 4 to 8 March at IMO Headquarters in London, approved a Circular containing a raft of design suggestions for ballast water and sediment management options in new ships. As a fundamental principle, the Circular states that…

08 May 2002

New Measures on Ballast Water Management Approval

"Back to the drawing board" is the message to designers of new vessels, as ballast water management is to become a major consideration in the design of new vessels following the approval by IMO of a series of measures aimed at reducing the effects of marine organisms transported in ballast water and the risks involved in some ballast water management techniques. The 47th session of the International Maritime Organization's Marine Environment Protection Committee (MEPC), which met in March in London, approved a Circular containing design suggestions for ballast water and sediment management options in new ships. The Circular says that…

09 Feb 2005

Construction of Marine Science Vessels Up

Marine science is making great strides forward due in large measure to several new vessels that have delivered recently and others under construction Headlining this news is the Oscar Dyson, the first of four vessels loaded with scientific gear that the National Oceanic and Atmospheric Administration (NOAA) is having built at VT Halter Marine, Pascagoula, Miss. The first vessel was completed in September of 2004 and as the Oscar Dyson was being completed, the contract for the second vessel, Henry B. Bigelow was announced. These 208-ft. by 49-ft. vessels have cutting edge capabilities to gather scientific information on fish populations and the water quality of their habitat.

28 Aug 2002

KMSS Wins India Simulator Contract

Gas Cargo Handling Simulator. The highly advanced simulator will be the first of its kind and will feature two ship models – one LPG tanker and one LNG tanker. The installation will feature extensive instructor facilities located in a separate room and fitted with monitoring, control and recording equipment. From here a student evaluation system will be implemented, allowing instructors to introduce fault sequences, malfunctions and actions in order to build relevant scenarios and objectively assess student competence. Also featured will be a Control Room area and a Deck area, both of which will be located in separate rooms. The Control Room will feature interactive…

07 Dec 1999

Great Ship - Geco-Eagle

Signifying the best of an outstanding new crop of seismic vessels, the Norwegian-built wedge-shaped Geco Eagle sports a 121 ft. (37m) wide back deck to store and deploy more recording equipment than any other vessel afloat, but the unique shipshape does not lead to a trade-off in capacity. The ability to survey more territory in a time and cost efficient manner has directly led to the tremendous push for deeper water resources exploration. Geco-Prakla routinely deploys 6 km streamers and the slim Nessie-4 streamers and large streamer reels will enable Geco Eagle to easily deploy streamers over 8km. Geco Eagle is equipped with the Monowing* II deflector system…