Hyde Guardian BWTS Earns USCG Approval

MarineLink.com
Monday, April 15, 2013
Photo: Hyde Marine

Calgon Carbon Corporation announced that its Hyde Guardian Ballast Water Treatment System (BWTS), developed and manufactured by its wholly owned subsidiary, Hyde Marine, Inc., became one of the first BWTS to earn Alternate Management System (AMS) approval from the United States Coast Guard (USCG).

AMS approval is a first step to achieving full USCG Type Approval and is an interim measure that allows these BWTS to be used on vessels for five years after the vessel is required to comply with the USCG Ballast Water Discharge Standards. The five-year period is designed to allow the BWTS manufacturer sufficient time to obtain U.S. Type Approval and to ensure the ship operator’s compliance with U.S. ballast water regulations.

Most vessels operating in U.S. waters with ballast capacities between 1500 ¬m³/hr and 5000 m³/hr will be required to meet USCG Ballast Water Discharge Standards by the time of their first major drydocking after January 1, 2014. “Shipowners and operators seeking to mitigate downtime and ensure timely vessel compliance are encouraged to place orders for BWT systems now before the supply of accepted systems becomes strained,” said John Platz, president of Hyde Marine and Vice President of CCC - UV Technologies Division.

To receive AMS approval from the Coast Guard, a BWTS must have been previously type approved by a foreign administration in accordance with the International Convention for the Control and Management of Ships’ Ballast Water and Sediments, and the Coast Guard must find the testing performed on the system credible.

In April 2009, the Hyde Guardian BWTS became one of the first systems to receive IMO Type Approval. It was also the first BWTS accepted into the U.S. Coast Guard’s Shipboard Technology Evaluation Program (STEP), which facilitates the development of effective BWTS technologies for vessel owners seeking alternatives to ballast water exchange. STEP participation is available to all foreign and domestic vessels subject to the Coast Guard’s Ballast Water Management (BWM) regulations.

The Hyde Guardian BWTS was tested and validated at the Royal Netherlands Institute for Sea Research (NIOZ), one of the most challenging ballast water test facilities in the world and proved to meet IMO G8 Guidelines and demonstrated reliable performance in difficult operating conditions.

The chemical free Hyde Guardian BWT process uses efficient, automatic backflushing depth filtration to remove sediment and organisms combined with a powerful ultraviolet disinfection system to prevent the spread of aquatic invasive species. Hyde GUARDIAN BWTS offers a compact, modular design with low power consumption, low pressure drop, and simple, fully automatic operation, making it a technically attractive solution for any type of vessel.

www.hydemarine.com

www.calgoncarbon.com
 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

USCG Makes Change in Fort Pierce Inlet Safety Zone

The Coast Guard has made a change in the Fort Pierce Inlet safety zone Thursday afternoon. Recreational vessels with less than six-foot draft are now allowed

USCG Foundation Announces Scholarships

The Coast Guard Foundation, a non-profit organization committed to the education and welfare of Coast Guard members and their families, announced today that

Fast Patrol Vessel launched by Cochin Shipyard

Cochin Shipyard Ltd (CSL) has launched the 14th of the series of 20 Fast Patrol Vessels (FPV) being built for the Indian Coast Guard.    With this, CSL said,

Classification Societies

Rolls-Royce to Power Zhuhai Ferries

Rolls-Royce has been selected to supply waterjets and high speed MTU diesel engines to power two new aluminium catamaran fast ferries for Chinese ferry operator

Inflatable Liferaft Service Requirements Amended

SOLAS regulation III/20.8 requires inflatable liferafts to be serviced at intervals not exceeding 12 months. It also requires the servicing to be carried out at

DNV GL Launch Joint Industry Project

Sour service fluids from wells place significant demands on pipeline material, particularly in deeper water. This can present major technical and financial challenges

 
 
Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3211 sec (3 req/sec)