New GL Guidelines for Complex Data Networks

MarineLink.com
Friday, July 12, 2013

Germanischer Lloyd (GL) has published new guidelines for data networks which are implemented onboard ships or offshore platforms.

As the maritime industry makes greater use of automated systems data networks have become more and more complex, while also integrating safety-critical and non-safety-critical application systems. The guidelines are available for download now on the GL website and will enter into force on August 1, 2013.

One of the main reasons for the increasing number of application systems which are connected through data networks is to minimize the total length of cabling installed throughout the vessel. Minimizing cable length not only reduces the material and installation costs for the cabling, but also avoids adding unnecessarily to the overall weight of the ship or the platform. This is especially relevant in cruise vessels, where the delivery of high quality interactive entertainment services to passengers is increasingly important.

In merchant shipping too, however, more and more vessels are equipped with integrated bridges that link information from the navigation and automation systems. Today, as well, modern automation systems are themselves complex integrated systems that comprise several monitoring sensors, control systems for the propulsion and power-generating systems and monitoring and alarm systems.

A type approval would be required for data networks which connect application systems related to classification such as: automation system, navigation system, alarm and monitoring system, general alarm and public address system, comprising all the necessary for monitoring, control and safety including in- and output devices. Non-class related application systems would include entertainment systems such as: radio, television, audio and video on demand and private internet access. The required approval would cover the entire network, including routers, switches, and process controllers connected with network cables.

In order to follow a systematic and reproducible risk-based approach for the approval process, a so-called Requirement Class is assigned to the respective data network. The scope of documents to be submitted for approval and the required function tests depend on this assignment.

There are five different Requirement Classes, differentiating the individual network according to the magnitude of the damage which would result from a potential component or system failure and its effect on the persons onboard, the environment and the technical condition of the vessel. This approach follows the same procedure as the approval process for computer systems under GL's Rules and Guidelines.

The Guidelines can be found on the GL website here: gl-group.com/infoServices/rules/pdfs/gl_vi-7-5_e.pdf.

 

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Rolls-Royce to Design, Equip Canadian Stern Trawler

The shipbuilding company VARD Group AS in Norway has received an order from a Canadian company for a shrimp stern trawler to be designed and equipped by Rolls-Royce,

MN: Corvus Energy

The Company: Corvus is a manufacturer of proven, high power Energy Storage Systems (ESS). Its field proven battery systems provide power to hybrid and fully electric marine propulsion systems.

Total Lubmarine Resumes Full Service in Tianjin

Marine lubricants and greases provider Total Lubmarine informs it has resumed all services based out of the Port of Tianjin following the deadly explosions that rocked the port August 12.

Offshore

Offshore Operators Can Simplify Safety Equipment Logistics

Safety equipment manufacturer VIKING Life-Saving Equipment said its Offshore Safety Agreements are providing relief for offshore operators seeking to ensure compliance

Keppel Delivers Jackup to UMW-OG

Keppel FELS, a wholly owned subsidiary of Keppel Offshore & Marine (Keppel O&M) has delivered UMW Naga 8, a KFELS B Class jackup rig, to Malaysia’s UMW Oil & Gas Corporation Berhad (UMW-OG).

Subsea 7 Bags $150 million Offshore UK Contract Maersk

Offshore contractor Subsea 7 has been awarded a $150 million subsea, umbilical, riser and flowline (SURF) contract by Maersk Oil for the development of the Culzean field in the UK North Sea.

Environmental

That’s Not Coming on Board!

There’s hardly anything that can’t be shipped in a container. However, for ethical reasons, Hapag-Lloyd refuses to transport certain goods.   Anyone who regularly transports goods for third parties,

Boat with 40 African Migrants Arrives on Spanish Island

A boat containing around 40 African migrants including a toddler girl landed on a beach on the Spanish island of Gran Canaria, sea rescue services said on Wednesday.

Rapid Oil Spill Response Vessel Launched

Western Canada Marine Response Corporation (WCMRC) launched their newest oil spill response vessel in Burrard Inlet. The boat, named after former employee George Penman,

Classification Societies

Tankers to Require Stability Instruments Starting 2016

Lloyd's Register informs that new stability instrument requirements will apply to all tankers constructed (keel laid) on or after January 1, 2016. These ships will

ClassNK Verifies lino Marine Service GHG

Classification society ClassNK has carried out the independent third-party verification of Iino Marine Service’s greenhouse gas (GHG) emissions inventory based on a reasonable level of assurance.

ClassNK to Issue Guidance on Composite Propellers

Classification society ClassNK announced it will release the world’s first Guidelines on Composite Propellers (Part on Manufacturing/Product Inspection) on August 31.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.6155 sec (2 req/sec)