New GL Guidelines for Complex Data Networks

MarineLink.com
Friday, July 12, 2013

Germanischer Lloyd (GL) has published new guidelines for data networks which are implemented onboard ships or offshore platforms.

As the maritime industry makes greater use of automated systems data networks have become more and more complex, while also integrating safety-critical and non-safety-critical application systems. The guidelines are available for download now on the GL website and will enter into force on August 1, 2013.

One of the main reasons for the increasing number of application systems which are connected through data networks is to minimize the total length of cabling installed throughout the vessel. Minimizing cable length not only reduces the material and installation costs for the cabling, but also avoids adding unnecessarily to the overall weight of the ship or the platform. This is especially relevant in cruise vessels, where the delivery of high quality interactive entertainment services to passengers is increasingly important.

In merchant shipping too, however, more and more vessels are equipped with integrated bridges that link information from the navigation and automation systems. Today, as well, modern automation systems are themselves complex integrated systems that comprise several monitoring sensors, control systems for the propulsion and power-generating systems and monitoring and alarm systems.

A type approval would be required for data networks which connect application systems related to classification such as: automation system, navigation system, alarm and monitoring system, general alarm and public address system, comprising all the necessary for monitoring, control and safety including in- and output devices. Non-class related application systems would include entertainment systems such as: radio, television, audio and video on demand and private internet access. The required approval would cover the entire network, including routers, switches, and process controllers connected with network cables.

In order to follow a systematic and reproducible risk-based approach for the approval process, a so-called Requirement Class is assigned to the respective data network. The scope of documents to be submitted for approval and the required function tests depend on this assignment.

There are five different Requirement Classes, differentiating the individual network according to the magnitude of the damage which would result from a potential component or system failure and its effect on the persons onboard, the environment and the technical condition of the vessel. This approach follows the same procedure as the approval process for computer systems under GL's Rules and Guidelines.

The Guidelines can be found on the GL website here: gl-group.com/infoServices/rules/pdfs/gl_vi-7-5_e.pdf.

 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Gas Turbine Acceptance Test Completed for S. Korea Navy

Rolls-Royce has reached a milestone in the Republic of Korea Navy’s FFX frigate program, with the successful completion of acceptance tests for the MT30 gas turbine.

Mercury Marine Launches Repower Financing

Mercury Marine launched a new repower finance program that aims to make it easier for consumers to get the engine performance they want with flexible financing for a broad range of buyers.

MN 100: Twin Disc, Inc.

1328 Racine Street Racine, WI 53403 Telephone: 262 638 4000 Web: www.twindisc.com President and CEO: John H. Batten Number of employees: 990 The Company: Twin Disc designs,

Offshore

Houston Shipping and Offshore Conference Program Announced

The fourth Houston Shipping and Offshore Conference has announced the final program for its Friday, October 10 conference at the Houstonian Hotel, Club & Spa, 111 N.

EMS Seven Seas Announces New CEO

EMS Seven Seas announces new CEO; enters into agreement to acquire Wave Shipping, a Singapore-based maritime and port agency services company. EMS Seven Seas,

iSURVEY Awarded Two-year Contract with Island Offshore

iSURVEY has been awarded a two-year contract with offshore vessel owner, Island Offshore Management, which will see iSURVEY AS provide positioning services to Island

Environmental

Prime Minister Solberg Visits DNV GL

Norway’s Prime Minister Erna Solberg visited DNV GL Høvik yesterday, September 16. Group President & CEO Henrik Madsen was host. “The Prime Minister was both

World’s Largest Iceberg Continues to Break Apart

The United States National Ice Center (NIC) named three new icebergs after a previous iceberg B15T broke into four pieces. B15T remains, while the resultant icebergs are named B15Z, B15AA and B15AB.

Impact of Upcoming Regulations on Wreck Removal

The Nairobi International Convention on wreck removal was ratified by India recently and will be enforceable from April next year. This will place financial responsibility

Classification Societies

Prime Minister Solberg Visits DNV GL

Norway’s Prime Minister Erna Solberg visited DNV GL Høvik yesterday, September 16. Group President & CEO Henrik Madsen was host. “The Prime Minister was both

Hans Hansen is DNV GL's Area Manager for Scandinavia

In the power sector DNV GL supports the industry in delivering a secure, sustainable, available and affordable energy supply. In his new role Hans Tormod Hansen

DNV GL: Beyond Condition Monitoring in the Maritime Industry

Moving from a regime of scheduled rule-based maintenance to a data-driven risk-based regime can lead to more accurate and timely maintenance resulting in increased safety,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1234 sec (8 req/sec)