New GL Guidelines for Complex Data Networks

MarineLink.com
Friday, July 12, 2013

Germanischer Lloyd (GL) has published new guidelines for data networks which are implemented onboard ships or offshore platforms.

As the maritime industry makes greater use of automated systems data networks have become more and more complex, while also integrating safety-critical and non-safety-critical application systems. The guidelines are available for download now on the GL website and will enter into force on August 1, 2013.

One of the main reasons for the increasing number of application systems which are connected through data networks is to minimize the total length of cabling installed throughout the vessel. Minimizing cable length not only reduces the material and installation costs for the cabling, but also avoids adding unnecessarily to the overall weight of the ship or the platform. This is especially relevant in cruise vessels, where the delivery of high quality interactive entertainment services to passengers is increasingly important.

In merchant shipping too, however, more and more vessels are equipped with integrated bridges that link information from the navigation and automation systems. Today, as well, modern automation systems are themselves complex integrated systems that comprise several monitoring sensors, control systems for the propulsion and power-generating systems and monitoring and alarm systems.

A type approval would be required for data networks which connect application systems related to classification such as: automation system, navigation system, alarm and monitoring system, general alarm and public address system, comprising all the necessary for monitoring, control and safety including in- and output devices. Non-class related application systems would include entertainment systems such as: radio, television, audio and video on demand and private internet access. The required approval would cover the entire network, including routers, switches, and process controllers connected with network cables.

In order to follow a systematic and reproducible risk-based approach for the approval process, a so-called Requirement Class is assigned to the respective data network. The scope of documents to be submitted for approval and the required function tests depend on this assignment.

There are five different Requirement Classes, differentiating the individual network according to the magnitude of the damage which would result from a potential component or system failure and its effect on the persons onboard, the environment and the technical condition of the vessel. This approach follows the same procedure as the approval process for computer systems under GL's Rules and Guidelines.

The Guidelines can be found on the GL website here: gl-group.com/infoServices/rules/pdfs/gl_vi-7-5_e.pdf.

 

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Yanmar Diesel Engines for Fast New Crew Tender

The expansion of the number of wind turbines out at sea near the northern Dutch coast was reason enough for Ubels Offshore to expand its fleet with a fifth ship last year.

Hapag-Lloyd's New Noses Lower Emissions

Hamburg based shipping company Hapag-Lloyd plans for 24 of the largest containerships in its fleet to get new bulbous bows by 2016, with some of the vessels also

The Hour of Power: Hybrid Marine Technology and Green Ports

In 2015 two significant developments are going to make many operators, owners and builders of professional vessels consider hybrid marine power. Firstly the new emissions laws in ports,

Offshore

Yanmar Diesel Engines for Fast New Crew Tender

The expansion of the number of wind turbines out at sea near the northern Dutch coast was reason enough for Ubels Offshore to expand its fleet with a fifth ship last year.

Shell Green Lights GoM Field After Cost Cuts

Royal Dutch Shell has given the green light for the development of its largest platform in the Gulf of Mexico after making steep cost cuts which made the deep water

Statoil to Suspend Saipem Rig Contract

Norwegian oil major Statoil said on Wednesday it will suspend a rig contract with Italy's Saipem due to overcapacity in its rig portfolio. The suspension of

Environmental

Hapag-Lloyd's New Noses Lower Emissions

Hamburg based shipping company Hapag-Lloyd plans for 24 of the largest containerships in its fleet to get new bulbous bows by 2016, with some of the vessels also

Charleston Harbor Deepening Gets US Funding

Charleston Harbor deepening project earns key federal funding for preconstruction engineering and design; U.S. Army Corps of Engineers allocates $1.303 million

The Hour of Power: Hybrid Marine Technology and Green Ports

In 2015 two significant developments are going to make many operators, owners and builders of professional vessels consider hybrid marine power. Firstly the new emissions laws in ports,

Classification Societies

NAPA Streamlines Compliance with Class Design Rules

NAPA Steel and NAPA Designer updated to reduce man-hours and duplication associated with new Common Structural Rules BC&OT   Global maritime software, services

DNV GL Holds Hearing Ahead of New Rules Launch

More than 800 customers and stakeholders will receive the new DNV GL rules today as part of an external hearing process before their publication and entry into force.

IRClass Offers EEDI Validation Service

IRClass (Indian Register of Shipping) has recently included Energy Efficiency Design Index (EEDI) validation to its service offerings. This is in response to the

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2090 sec (5 req/sec)