New GL Guidelines for Complex Data Networks

MarineLink.com
Friday, July 12, 2013

Germanischer Lloyd (GL) has published new guidelines for data networks which are implemented onboard ships or offshore platforms.

As the maritime industry makes greater use of automated systems data networks have become more and more complex, while also integrating safety-critical and non-safety-critical application systems. The guidelines are available for download now on the GL website and will enter into force on August 1, 2013.

One of the main reasons for the increasing number of application systems which are connected through data networks is to minimize the total length of cabling installed throughout the vessel. Minimizing cable length not only reduces the material and installation costs for the cabling, but also avoids adding unnecessarily to the overall weight of the ship or the platform. This is especially relevant in cruise vessels, where the delivery of high quality interactive entertainment services to passengers is increasingly important.

In merchant shipping too, however, more and more vessels are equipped with integrated bridges that link information from the navigation and automation systems. Today, as well, modern automation systems are themselves complex integrated systems that comprise several monitoring sensors, control systems for the propulsion and power-generating systems and monitoring and alarm systems.

A type approval would be required for data networks which connect application systems related to classification such as: automation system, navigation system, alarm and monitoring system, general alarm and public address system, comprising all the necessary for monitoring, control and safety including in- and output devices. Non-class related application systems would include entertainment systems such as: radio, television, audio and video on demand and private internet access. The required approval would cover the entire network, including routers, switches, and process controllers connected with network cables.

In order to follow a systematic and reproducible risk-based approach for the approval process, a so-called Requirement Class is assigned to the respective data network. The scope of documents to be submitted for approval and the required function tests depend on this assignment.

There are five different Requirement Classes, differentiating the individual network according to the magnitude of the damage which would result from a potential component or system failure and its effect on the persons onboard, the environment and the technical condition of the vessel. This approach follows the same procedure as the approval process for computer systems under GL's Rules and Guidelines.

The Guidelines can be found on the GL website here: gl-group.com/infoServices/rules/pdfs/gl_vi-7-5_e.pdf.

 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

MAN 28/33D STC Engines for Thai Navy’s New OPV

The Royal Thai Navy has ordered a new 90-m offshore patrol vessel (OPV) to be constructed at Mahidol Adulyadej naval dockyard in Sattahip.  The newbuilding, an improved River-class design,

Norsafe Debuts New RIB in Gothenburg

Norsafe has released its first RIB, the Marathon 900, to compliment its range of boat models for professional and military customers.  Launched at High Speed

Wärtsilä Donates Engine to Texas A&M University

Wärtsilä has donated an 8-cylinder Wärtsilä 20 engine and generating set, to the Marine Engineering Technology Department at Texas A&M University at Galveston.

Offshore

Mermaid Maritime Bags Subsea Contracts, Delays Newbuilding

Thailand’s Mermaid Maritime said it has been awarded a number of subsea contracts in the Middle East with a total worth of $11million.   It has also reached

Hercules Offshore Filing for Bankruptcy Again

Hercules Offshore Inc said it planned to file for prepackaged Chapter 11 bankruptcy, just six months after the rig contractor emerged from bankruptcy protection.

DONG Energy Listing to Value Group at up to $16 Bln

DONG Energy's has set a potential $16 billion price tag on its stock market debut, giving investors a chance to buy into the growth in offshore wind power, but

Environmental

US Navy Updated Zika Virus Infection Guidance

Navy Medicine released updated Zika Virus Infection guidance in NAVADMIN 121/16, May 26, communicating current information, travel precautions, and risk reduction

Seaspan Acquires Eighth 14000 TEU Vessel

Seaspan Corporation (NYSE:SSW) announced today that it accepted delivery of a 14000 TEU containership, the YM Width. The new containership, which was constructed at CSBC Corporation,

GloMEEP Project Forges Ahead with Train-the-Trainer Workshop

A global Train-the-Trainer workshop on energy efficiency has been delivered in China (23-27 May), preparing the personnel needed to cascade knowledge on energy

Classification Societies

IACS Recommendations for Emergency Response

Following a further round of discussions on 'Places of Refuge' at the IMO last week, prompted by a submission from the EU Member States, the European Commission,

Meet the Future Surveyor

Knut Ørbeck-Nilssen, CEO Maritime, DNV GL discusses the future of class   DNV GL is now integrated and fully armed to address the challenges of the day. Drones

Damen's Oranjewerf Yard ISO 9001:2008 Certified

Damen Shiprepair Oranjewerf (DSO) has become the latest Damen ship repair yard to receive ISO 9001:2008 certification, demonstrating that the yard fulfils the requirements

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0857 sec (12 req/sec)