Marine Link
Friday, April 19, 2024
SUBSCRIBE

Class Landing Craft Utilities News

08 Jul 2002

Halter Lays Keel for U.S. Army’s Newest ELSV

HMI, a division of Friede Goldman Halter, Inc. laid the keel of the U.S. Army’s Tank and Automotive Command (TACOM) new Enhanced Logistic Vessel (ELSV). The vessel will support TACOM logistical efforts on a worldwide basis. The completed vessels will be 314 ft. long, have a 60 ft. beam and an overall depth of 19ft. The construction will take about two years to complete. Halter has previously built for the U.S. Army 6 Logistic Support Vessels, 6 large tugs and 35 LCU-2000 class landing craft utilities. Anil Raj, Chief Operating Officer of FGH said, “Halter has designed and built all of the U.S. Army’s LSVs – this being number seven. Two additional LSV’s have been built previously for the Philippine Navy. We value the trust and confidence that the Army has placed in Halter’s team.

14 Aug 2002

Christenings & Deliveries

Trico Marine Services, Inc., has taken delivery on the Northern Canyon, a 279-ft. UT 745 design platform supply vessel (PSV). The state-of-the-art vessel is designed to serve deepwater markets worldwide. Built in Norway, the Northern Canyon is equipped with a DP2 (dynamic positioning) system and is among the largest, most technologically advanced PSVs available in the industry. The vessel, which will be deployed initially in the North Sea, is quipped as a remotely operated vehicle vessel to perform subsea construction work globally. It has been awarded a three-year contract by Canyon-Offshore, Inc. Trico is scheduled to take delivery of a second 279-ft. PSV in September 2002. It also expects to take delivery of three new generation 155-ft.